40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 2 of 53  Not logged in ELOG logo
    Reply  Wed May 2 19:48:32 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam IMG_0853.jpgIMG_0854.JPGIMG_0852.jpgresult.png
    Reply  Thu May 3 22:26:14 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam IMG_0855.JPGIMG_0856.jpg
    Reply  Fri May 4 20:19:58 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam IMG_0863.JPGIMG_0864.jpg
    Reply  Wed May 9 03:11:33 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam IO_lid_compare.pngIO_lid_compare.pngcomputer_compare.png
    Reply  Wed May 30 23:39:15 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam IMG_1300.jpg
    Reply  Wed May 30 23:39:41 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam IMG_1300.jpg
    Reply  Fri Jun 1 01:00:30 2012, frank, tara, DailyProgress, Acoustics, acoustic enclosure for input beam beat_2012_05_31.pngbeat_2012_05_31_b.png
Entry  Tue Aug 17 15:57:11 2010, Frank, Notes, BEAT, power on beat PD 
Entry  Thu Aug 26 19:58:06 2010, Frank, Notes, BEAT, changed ACAV setpoint temperature - both cavities locked 
Entry  Thu Aug 26 23:00:35 2010, Frank, Notes, BEAT, lock-loss of both cavities 
Entry  Thu Aug 26 23:18:12 2010, Frank, Notes, BEAT, both cavities relocked 
    Reply  Fri Aug 27 18:49:43 2010, tara, Notes, BEAT, both cavities relocked 
Entry  Wed Sep 1 00:27:34 2010, tara, Notes, BEAT, symmetric optic layout for beat measurement  beatlayout.png
Entry  Thu Sep 9 20:55:22 2010, tara, Notes, BEAT, calibration V->Hz for IFR2023B 
Entry  Fri Sep 10 12:22:04 2010, tara, DailyProgress, BEAT, beat noise measurement new_beat.png
Entry  Thu Nov 11 22:50:14 2010, tara, DailyProgress, BEAT, beat noise measurement psl_refcav_sio2_300K.pngdata.mat
Entry  Mon Nov 15 18:05:34 2010, tara, DailyProgress, BEAT, coherence <fbeat|RCAV>, <fbeat|ACAV> coherence_before_realign.pngcoherence_after_realign.pngbeat_2010_11_15.png
Entry  Fri Nov 19 14:28:28 2010, tara, DailyProgress, BEAT, TF comparison between PLL feedback and VCO feedback TF_compare.png
    Reply  Fri Nov 19 14:36:19 2010, Koji, DailyProgress, BEAT, TF comparison between PLL feedback and VCO feedback 
Entry  Wed Dec 1 22:07:05 2010, tara, DailyProgress, BEAT, beat vs Power Input  beat_2010_12_01.png2010_12_01.zip
Entry  Fri Dec 3 01:34:02 2010, tara, DailyProgress, BEAT, Faraday isolator added behind the PMC beat_2010_12_02.png2010_12_02.zip
Entry  Sat Dec 4 00:12:21 2010, frank, tara, DailyProgress, BEAT, PD for PLL  SCRN0232.GIF
    Reply  Sun Dec 5 18:36:10 2010, Frank, DailyProgress, BEAT, PD for PLL: additional information 
Entry  Mon Dec 6 22:09:59 2010, frank, tara, DailyProgress, BEAT, replacing PMC, adding EAOM  beat_2010_12_07.png
Entry  Tue Dec 7 16:15:38 2010, tara, Notes, BEAT, PLL OLG TF PLL_OLG_TF.png
Entry  Wed Dec 8 00:15:42 2010, frank, tara, DailyProgress, BEAT, LO phase noise 10kHzspan.pngnoPMC.pngbeat_10kHz.png
Entry  Sun Dec 12 22:11:11 2010, tara, Notes, BEAT, nb with VCO noise at 10khz input range nb_10kHz.pngnb_100kHz.png
Entry  Wed Dec 15 11:26:39 2010, frank, tara, Notes, BEAT, cleaning optics to get rid of scattering light clean_2010_12_15.jpgbeat_2010_12_15.png
    Reply  Fri Dec 17 02:23:38 2010, frank, tara, Notes, BEAT, cleaning optics to get rid of scattering light clean_2010_12_16.jpgbeat_2010_12_16.png
Entry  Thu Jan 20 11:32:40 2011, tara, Photos, BEAT, beat layout with 3" height beat.jpg
Entry  Mon Jan 31 20:24:45 2011, frank, tara, Notes, BEAT, beat signal down to 12.5 mHz beat_2011_01_30_lowf.png
Entry  Tue Feb 1 19:26:47 2011, Frank, Notes, BEAT, loss of RF cables 
    Reply  Tue Feb 1 22:22:46 2011, frank, tara, Notes, BEAT, beat signal down to 12.5 mHz PLL_FC_good.png2011_02_01_log3.pngac_highpass.png2011_02_01_dat.matcode_2011_02_01.m
Entry  Wed Feb 2 13:48:22 2011, tara, DailyProgress, BEAT, Comparison bewteen beat from PLL and FC beat_2011_02_02.png
Entry  Thu Feb 3 14:25:18 2011, Frank, Summary, BEAT, Frequency counter time series frequcount_timeseries2.pngfreqcounter_timeseries.dat
Entry  Fri Feb 4 01:03:47 2011, Frank, DailyProgress, BEAT, cable delay setup cable-delay.png
    Reply  Fri Feb 4 13:59:48 2011, Frank, DailyProgress, BEAT, trend of the setup Untitled.png
Entry  Fri Feb 4 19:26:50 2011, Frank, DailyProgress, BEAT, changed to shorter cable 
Entry  Mon Feb 7 15:38:38 2011, Frank, Notes, BEAT, cable phase noise measurement stopped 
Entry  Mon Feb 7 16:14:19 2011, Frank, Notes, BEAT, cable phase noise measurement calibration 
Entry  Tue Feb 8 10:41:59 2011, Frank, Summary, BEAT, cavity drift within 24h cavity-drift.png
Entry  Wed Feb 9 02:07:25 2011, Frank,Tara, DailyProgress, BEAT, long-term frequency drift/noise - once more 
Entry  Wed Feb 9 19:57:43 2011, Frank, Notes, BEAT, new cable length - calibration data 
Entry  Thu Feb 10 00:21:55 2011, Frank, Summary, BEAT, comparison VCO feedback signal and "cable technique" 6x
Entry  Thu Feb 10 01:16:42 2011, Tara, Notes, BEAT, collection of beat data, H1 arm noise, and SR560 noise  beat_2011_02_09.pngbeat_data.matcode_2011_02_09.m
    Reply  Thu Feb 10 12:00:55 2011, rana, Notes, BEAT, collection of beat data, H1 arm noise, and SR560 noise  Screen_shot_2011-02-10_at_10.39.43_AM.png
Entry  Fri Feb 11 13:46:20 2011, Frank, Notes, BEAT, calibrated error signal vs frequency mixer_output.pngcalibrated_error_signal.png
Entry  Fri Feb 11 19:45:49 2011, Frank, Notes, BEAT, updated diagram of current cable delay setup cable-delay_v2.pdf
    Reply  Fri Feb 11 21:32:25 2011, tara, Notes, BEAT, calibrated error signal vs frequency 
Entry  Tue Feb 15 01:02:31 2011, Frank, DailyProgress, BEAT, calibration problems? frequency_drift.pngfnoise.png
ELOG V3.1.3-