40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL, Page 22 of 29  Not logged in ELOG logo
Entry  Fri Feb 11 19:45:49 2011, Frank, Notes, BEAT, updated diagram of current cable delay setup cable-delay_v2.pdf
Entry  Thu Feb 10 19:37:23 2011, frank, tara, Notes, Electronics Equipment, SR560 noise level 
    Reply  Fri Feb 11 14:35:21 2011, frank, tara, Notes, Electronics Equipment, SR560 noise level 
Entry  Thu Feb 10 16:45:32 2011, Frank, Summary, Electronics Equipment, ultra low-noise pre-amps 7x
Entry  Thu Feb 10 01:16:42 2011, Tara, Notes, BEAT, collection of beat data, H1 arm noise, and SR560 noise  beat_2011_02_09.pngbeat_data.matcode_2011_02_09.m
    Reply  Thu Feb 10 12:00:55 2011, rana, Notes, BEAT, collection of beat data, H1 arm noise, and SR560 noise  Screen_shot_2011-02-10_at_10.39.43_AM.png
Entry  Thu Feb 10 00:21:55 2011, Frank, Summary, BEAT, comparison VCO feedback signal and "cable technique" 6x
Entry  Wed Feb 9 19:57:43 2011, Frank, Notes, BEAT, new cable length - calibration data 
Entry  Tue Feb 8 00:26:44 2011, frank, tara, DailyProgress, RefCav, running thermal PID perl script 2011_02_07_RCPID.png
    Reply  Wed Feb 9 15:41:45 2011, frank, tara, DailyProgress, RefCav, running thermal PID perl script 
Entry  Wed Feb 9 02:07:25 2011, Frank,Tara, DailyProgress, BEAT, long-term frequency drift/noise - once more 
Entry  Tue Feb 8 13:50:01 2011, Frank, Notes, RefCav, plz no more temp servo tuning - want to take data 
Entry  Tue Feb 8 12:02:06 2011, tara, DailyProgress, RefCav, Temperature response Screenshot.png
Entry  Tue Feb 8 10:41:59 2011, Frank, Summary, BEAT, cavity drift within 24h cavity-drift.png
Entry  Tue Feb 8 00:03:02 2011, Frank, Summary, VCO, calibrated VCO monitor signal now fully available 
Entry  Mon Feb 7 20:33:00 2011, Frank, Summary, VCO, calibrated VCO monitor signal now available 
Entry  Mon Feb 7 18:13:31 2011, Frank, Summary, VCO, VCO tuning - fitted function vco-tuning_fit2.pngvco-tuning_fit1.png
Entry  Mon Feb 7 16:14:19 2011, Frank, Notes, BEAT, cable phase noise measurement calibration 
Entry  Mon Feb 7 15:38:38 2011, Frank, Notes, BEAT, cable phase noise measurement stopped 
Entry  Sun Feb 6 02:38:07 2011, Frank, DailyProgress, RefCav, both cavities locked again 
Entry  Fri Feb 4 19:26:50 2011, Frank, DailyProgress, BEAT, changed to shorter cable 
Entry  Fri Feb 4 01:03:47 2011, Frank, DailyProgress, BEAT, cable delay setup cable-delay.png
    Reply  Fri Feb 4 13:59:48 2011, Frank, DailyProgress, BEAT, trend of the setup Untitled.png
Entry  Thu Feb 3 14:25:18 2011, Frank, Summary, BEAT, Frequency counter time series frequcount_timeseries2.pngfreqcounter_timeseries.dat
Entry  Wed Feb 2 20:47:00 2011, koji, frank, tara, Notes, NoiseBudget, mechanical peaks in beat noise 2011_02_02_kick.png
Entry  Wed Feb 2 14:18:37 2011, tara, Notes, NoiseBudget, Temperature vs frequency shift temp-vco.pngvco_vs_T.png
    Reply  Wed Feb 2 17:59:24 2011, rana, Notes, NoiseBudget, Temperature vs frequency shift 
Entry  Wed Feb 2 13:48:22 2011, tara, DailyProgress, BEAT, Comparison bewteen beat from PLL and FC beat_2011_02_02.png
Entry  Tue Feb 1 23:16:10 2011, Frank, HowTo, Electronics Equipment, TF (attenuation) of 500ft of RG58  P1700783.JPGTF_500ft_RG58CU.png
Entry  Mon Jan 31 20:24:45 2011, frank, tara, Notes, BEAT, beat signal down to 12.5 mHz beat_2011_01_30_lowf.png
    Reply  Tue Feb 1 22:22:46 2011, frank, tara, Notes, BEAT, beat signal down to 12.5 mHz PLL_FC_good.png2011_02_01_log3.pngac_highpass.png2011_02_01_dat.matcode_2011_02_01.m
Entry  Tue Feb 1 20:47:14 2011, Frank, Notes, DAQ, VCO feedback signal now recording 
Entry  Tue Feb 1 19:26:47 2011, Frank, Notes, BEAT, loss of RF cables 
Entry  Mon Jan 31 21:40:50 2011, Frank, Tara, Summary, DAQ, new channel for frequency counter added 
Entry  Mon Jan 31 19:42:36 2011, Frank, Notes, Computers, current IP-address 
Entry  Tue Jan 25 16:30:16 2011, Tara, Frank, DailyProgress, Electronics Equipment, RCAV RFPD fixed RCAV-RFPD1.jpgRCAV-RFPD2.jpgnew_RCAV-RFPD3.jpg
    Reply  Fri Jan 28 13:35:35 2011, Tara, Frank, DailyProgress, Electronics Equipment, RCAV RFPD fixed 35MHzPD.pngpd21.png
       Reply  Sun Jan 30 22:58:35 2011, Tara, DailyProgress, Electronics Equipment, RCAV RFPD fixed beat_2011_01_30.png
Entry  Wed Jan 26 20:21:57 2011, Frank, Summary, Electronics Equipment, ACAV RFPD modified D980454-00_modified_ACAV.pdf
Entry  Tue Jan 25 11:30:05 2011, Frank, Notes, Electronics Equipment, Perkin Elmer 2mm InGaAs photodiodes - dark current characterization PerkinElmer_2mm.png
Entry  Mon Jan 24 19:05:41 2011, Frank, Notes, Electronics Equipment, RFPD photodiodes 
    Reply  Mon Jan 24 20:26:44 2011, tara, Notes, Electronics Equipment, RFPD photodiodes 
Entry  Thu Jan 20 11:32:40 2011, tara, Photos, BEAT, beat layout with 3" height beat.jpg
Entry  Mon Jan 10 14:27:11 2011, Jan, Summary, PEM, Weekly plots; starting date 01/01/2011 Plot7.jpgPlot9.jpg
Entry  Mon Jan 10 13:28:36 2011, Jan, Summary, PEM, Weekly plots; start date 2010-12-25 Plot10.jpgPlot12.jpg
Entry  Mon Jan 10 10:37:43 2011, Jan, Notes, PEM, Table versus ground Plot16_2011-01-08.jpgPlot5_2011-01-08.jpgPlot5_2010-12-19.jpgRayleigh_HV.pngPlot16_2010-12-18.jpg
Entry  Mon Dec 27 23:11:32 2010, tara, DailyProgress, NoiseBudget, RIN coupling to frequency noise ACAV_RIN.pdffdbk_to_VCO.pdfbeat.pdf
    Reply  Tue Dec 28 05:24:16 2010, rana, DailyProgress, NoiseBudget, RIN coupling to frequency noise 
Entry  Mon Dec 27 10:10:39 2010, Jan, Summary, PEM, Weekly plots; T240 on PSL table Plot8.jpgPlot10.jpgPlot12.jpg
Entry  Mon Dec 20 19:55:11 2010, tara, DailyProgress, optic, rearraging optics for beat measurement 
    Reply  Thu Dec 23 22:41:28 2010, tara, DailyProgress, optic, rearraging optics for beat measurement 
       Reply  Sun Dec 26 02:42:47 2010, tara, DailyProgress, optic, rearraging optics for beat measurement 
          Reply  Mon Dec 27 02:51:33 2010, tara, DailyProgress, optic, rearraging optics for beat measurement beat_2010_12_27.png
Entry  Mon Dec 20 14:35:23 2010, tara, Notes, Electronics Equipment, adjusting polarization for 35.5 MHz EOM 
    Reply  Mon Dec 20 22:52:55 2010, rana, HowTo, PMC, nuts 
       Reply  Thu Dec 23 22:26:14 2010, rana, HowTo, PMC, nuts 
Entry  Mon Dec 20 00:59:21 2010, Jan, Summary, PEM, Plots of seismic data 2010-12-19 12x
Entry  Mon Dec 20 00:08:57 2010, Jan, Summary, PEM, 2-day seismic analysis 13x
Entry  Wed Dec 15 11:26:39 2010, frank, tara, Notes, BEAT, cleaning optics to get rid of scattering light clean_2010_12_15.jpgbeat_2010_12_15.png
    Reply  Fri Dec 17 02:23:38 2010, frank, tara, Notes, BEAT, cleaning optics to get rid of scattering light clean_2010_12_16.jpgbeat_2010_12_16.png
Entry  Thu Dec 16 12:38:57 2010, Frank, Jan, DailyProgress, Environment, seismometer installed on PSL table 
Entry  Wed Dec 15 01:35:44 2010, Frank, Notes, RefCav, things to do 
Entry  Mon Dec 13 18:50:02 2010, frank, tara, DailyProgress, Foam, increase inner insulation holes' size 100_1176.jpg100_1179.jpg
    Reply  Tue Dec 14 22:00:01 2010, frank, tara, DailyProgress, Foam, increase inner insulation holes' size beat_2010_12_14.png
Entry  Sun Dec 12 22:11:11 2010, tara, Notes, BEAT, nb with VCO noise at 10khz input range nb_10kHz.pngnb_100kHz.png
Entry  Fri Dec 10 18:14:47 2010, tara, DailyProgress, Foam, widen in-out holes on the foam box  rcav_open.pdf
Entry  Fri Dec 10 01:14:08 2010, tara, Summary, RefCav, RCAV/ACAV poles acav_pole.pngrcav_pole.png
    Reply  Fri Dec 10 12:07:34 2010, Frank, Summary, RefCav, RCAV/ACAV poles 
ELOG V3.1.3-