Fri Feb 11 19:45:49 2011, Frank, Notes, BEAT, updated diagram of current cable delay setup
|
Thu Feb 10 19:37:23 2011, frank, tara, Notes, Electronics Equipment, SR560 noise level
|
Fri Feb 11 14:35:21 2011, frank, tara, Notes, Electronics Equipment, SR560 noise level
|
Thu Feb 10 16:45:32 2011, Frank, Summary, Electronics Equipment, ultra low-noise pre-amps 7x
|
Thu Feb 10 01:16:42 2011, Tara, Notes, BEAT, collection of beat data, H1 arm noise, and SR560 noise  
|
Thu Feb 10 12:00:55 2011, rana, Notes, BEAT, collection of beat data, H1 arm noise, and SR560 noise
|
Thu Feb 10 00:21:55 2011, Frank, Summary, BEAT, comparison VCO feedback signal and "cable technique" 6x
|
Wed Feb 9 19:57:43 2011, Frank, Notes, BEAT, new cable length - calibration data
|
Tue Feb 8 00:26:44 2011, frank, tara, DailyProgress, RefCav, running thermal PID perl script
|
Wed Feb 9 15:41:45 2011, frank, tara, DailyProgress, RefCav, running thermal PID perl script
|
Wed Feb 9 02:07:25 2011, Frank,Tara, DailyProgress, BEAT, long-term frequency drift/noise - once more
|
Tue Feb 8 13:50:01 2011, Frank, Notes, RefCav, plz no more temp servo tuning - want to take data
|
Tue Feb 8 12:02:06 2011, tara, DailyProgress, RefCav, Temperature response
|
Tue Feb 8 10:41:59 2011, Frank, Summary, BEAT, cavity drift within 24h
|
Tue Feb 8 00:03:02 2011, Frank, Summary, VCO, calibrated VCO monitor signal now fully available
|
Mon Feb 7 20:33:00 2011, Frank, Summary, VCO, calibrated VCO monitor signal now available
|
Mon Feb 7 18:13:31 2011, Frank, Summary, VCO, VCO tuning - fitted function 
|
Mon Feb 7 16:14:19 2011, Frank, Notes, BEAT, cable phase noise measurement calibration
|
Mon Feb 7 15:38:38 2011, Frank, Notes, BEAT, cable phase noise measurement stopped
|
Sun Feb 6 02:38:07 2011, Frank, DailyProgress, RefCav, both cavities locked again
|
Fri Feb 4 19:26:50 2011, Frank, DailyProgress, BEAT, changed to shorter cable
|
Fri Feb 4 01:03:47 2011, Frank, DailyProgress, BEAT, cable delay setup
|
Fri Feb 4 13:59:48 2011, Frank, DailyProgress, BEAT, trend of the setup
|
Thu Feb 3 14:25:18 2011, Frank, Summary, BEAT, Frequency counter time series 
|
Wed Feb 2 20:47:00 2011, koji, frank, tara, Notes, NoiseBudget, mechanical peaks in beat noise
|
Wed Feb 2 14:18:37 2011, tara, Notes, NoiseBudget, Temperature vs frequency shift 
|
Wed Feb 2 17:59:24 2011, rana, Notes, NoiseBudget, Temperature vs frequency shift
|
Wed Feb 2 13:48:22 2011, tara, DailyProgress, BEAT, Comparison bewteen beat from PLL and FC
|
Tue Feb 1 23:16:10 2011, Frank, HowTo, Electronics Equipment, TF (attenuation) of 500ft of RG58 
|
Mon Jan 31 20:24:45 2011, frank, tara, Notes, BEAT, beat signal down to 12.5 mHz
|
Tue Feb 1 22:22:46 2011, frank, tara, Notes, BEAT, beat signal down to 12.5 mHz    
|
Tue Feb 1 20:47:14 2011, Frank, Notes, DAQ, VCO feedback signal now recording
|
Tue Feb 1 19:26:47 2011, Frank, Notes, BEAT, loss of RF cables
|
Mon Jan 31 21:40:50 2011, Frank, Tara, Summary, DAQ, new channel for frequency counter added
|
Mon Jan 31 19:42:36 2011, Frank, Notes, Computers, current IP-address
|
Tue Jan 25 16:30:16 2011, Tara, Frank, DailyProgress, Electronics Equipment, RCAV RFPD fixed  
|
Fri Jan 28 13:35:35 2011, Tara, Frank, DailyProgress, Electronics Equipment, RCAV RFPD fixed 
|
Sun Jan 30 22:58:35 2011, Tara, DailyProgress, Electronics Equipment, RCAV RFPD fixed
|
Wed Jan 26 20:21:57 2011, Frank, Summary, Electronics Equipment, ACAV RFPD modified
|
Tue Jan 25 11:30:05 2011, Frank, Notes, Electronics Equipment, Perkin Elmer 2mm InGaAs photodiodes - dark current characterization
|
Mon Jan 24 19:05:41 2011, Frank, Notes, Electronics Equipment, RFPD photodiodes
|
Mon Jan 24 20:26:44 2011, tara, Notes, Electronics Equipment, RFPD photodiodes
|
Thu Jan 20 11:32:40 2011, tara, Photos, BEAT, beat layout with 3" height
|
Mon Jan 10 14:27:11 2011, Jan, Summary, PEM, Weekly plots; starting date 01/01/2011 
|
Mon Jan 10 13:28:36 2011, Jan, Summary, PEM, Weekly plots; start date 2010-12-25 
|
Mon Jan 10 10:37:43 2011, Jan, Notes, PEM, Table versus ground    
|
Mon Dec 27 23:11:32 2010, tara, DailyProgress, NoiseBudget, RIN coupling to frequency noise  
|
Tue Dec 28 05:24:16 2010, rana, DailyProgress, NoiseBudget, RIN coupling to frequency noise
|
Mon Dec 27 10:10:39 2010, Jan, Summary, PEM, Weekly plots; T240 on PSL table  
|
Mon Dec 20 19:55:11 2010, tara, DailyProgress, optic, rearraging optics for beat measurement
|
Thu Dec 23 22:41:28 2010, tara, DailyProgress, optic, rearraging optics for beat measurement
|
Sun Dec 26 02:42:47 2010, tara, DailyProgress, optic, rearraging optics for beat measurement
|
Mon Dec 27 02:51:33 2010, tara, DailyProgress, optic, rearraging optics for beat measurement
|
Mon Dec 20 14:35:23 2010, tara, Notes, Electronics Equipment, adjusting polarization for 35.5 MHz EOM
|
Mon Dec 20 22:52:55 2010, rana, HowTo, PMC, nuts
|
Thu Dec 23 22:26:14 2010, rana, HowTo, PMC, nuts
|
Mon Dec 20 00:59:21 2010, Jan, Summary, PEM, Plots of seismic data 2010-12-19 12x
|
Mon Dec 20 00:08:57 2010, Jan, Summary, PEM, 2-day seismic analysis 13x
|
Wed Dec 15 11:26:39 2010, frank, tara, Notes, BEAT, cleaning optics to get rid of scattering light 
|
Fri Dec 17 02:23:38 2010, frank, tara, Notes, BEAT, cleaning optics to get rid of scattering light 
|
Thu Dec 16 12:38:57 2010, Frank, Jan, DailyProgress, Environment, seismometer installed on PSL table
|
Wed Dec 15 01:35:44 2010, Frank, Notes, RefCav, things to do
|
Mon Dec 13 18:50:02 2010, frank, tara, DailyProgress, Foam, increase inner insulation holes' size 
|
Tue Dec 14 22:00:01 2010, frank, tara, DailyProgress, Foam, increase inner insulation holes' size
|
Sun Dec 12 22:11:11 2010, tara, Notes, BEAT, nb with VCO noise at 10khz input range 
|
Fri Dec 10 18:14:47 2010, tara, DailyProgress, Foam, widen in-out holes on the foam box
|
Fri Dec 10 01:14:08 2010, tara, Summary, RefCav, RCAV/ACAV poles 
|
Fri Dec 10 12:07:34 2010, Frank, Summary, RefCav, RCAV/ACAV poles
|
|