this afternoon the PSL RT DAQ equipment arrived and we moved all the stuff down to the PSL lab. We now have to expansion chassis, 6 A/D and 2 D/A cards available for the PSL stuff. Some of the stuff we have to share with Peter's power stabilization experiment, but some we can use for the cavity experiment. The current plan is to install a second front-end computer in the PSL lab which we can use for high-speed sampling of important signals of the stabilization setup. |