40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Thu Dec 8 15:59:21 2011, Frank, Summary, PMC, realignment 
    Reply  Thu Dec 8 20:28:06 2011, tara, Summary, PMC, realignment 
       Reply  Thu Dec 8 21:06:10 2011, Frank, Summary, PMC, realignment 
          Reply  Fri Dec 9 06:32:24 2011, Tara, Summary, PMC, realignment 
             Reply  Thu Jan 12 16:04:05 2012, Tara, Summary, PMC, Isolator base, EOM base's height faraday_base.jpg
                Reply  Fri Jan 13 16:51:29 2012, Tara, Notes, optic, Isolator base, EOM base's height eom_base_2011_01_13.PDFdual_periscope_base.PDF
                   Reply  Thu Jan 26 12:40:21 2012, Tara, Notes, optic, Dual periscope base dual_periscope_base.PDF
Message ID: 759     Entry time: Fri Dec 9 06:32:24 2011     In reply to: 755     Reply to this: 783
Author: Tara 
Type: Summary 
Category: PMC 
Subject: realignment 

The V-block's height is a bit too high. The beam height is very close to 3".

Quote:

thanks for the info.

I only did the PMC so far as i had to fix the daq and add the new channels. What's the problem with beam height of the isolator? Is the beam too low or the mount too high? Do you know?

 

 

 

ELOG V3.1.3-