I finished aligning the beams from Ref cavity and Acavity, broke a connector on the PD we were going to used to measure the beat .
Frank borrowed another PD to use for now and ordered the replacement for the broken connector which should arrive next week.
Now I'm waiting for the temperature to settle, so both cavities can be locked and see the beat. |