Today we started working on the layout. There is one mistake in the layout, the mirror behind AOM for REFCAV is too close to the insulation box, so we have to fix the layout.
The oil on the table actually comes from holes on the table. About 5-6 screw holes had lot of oil, so I flushed them with methanol a few times.

The HEPA filter is plugged in and turned on. I unplugged one of the monitors and used the outlet for the filter.
The window is measured to be ~ 6 inches in diameter. Thus, the assumption in the design that the centers between two cavities are 3 inches is ok. If necessary, it can go up to 4 or 5 inches.


The layout is updated. The spot size in both AOMs are adjusted to 220 um.

|