The insulation work is done.
The pipes are installed. The insulation for the pipes will be installed on Nov 2, Tuesday 8:30am.
The work area will be the same, they just wrap insulation around the pipe, there should not be a lot of dust.
At 8:30 am, tomorrow, a workman will come in and install two pipes in the lab.
The pipes will be brazed, so no smoke or dust.
The working area will only above the fume hood near the entrance.
I'll be in the lab during the installing process.