Entry  Wed Oct 27 13:12:12 2010, tara, Notes, Environment, schedule for pipes installation  
    Reply  Thu Oct 28 10:49:53 2010, tara, Notes, Environment, schedule for pipes installation  
       Reply  Tue Nov 2 17:50:33 2010, tara, Notes, Environment, schedule for pipes installation  
Message ID: 377     Entry time: Tue Nov 2 17:50:33 2010     In reply to: 375
Author: tara 
Type: Notes 
Category: Environment 
Subject: schedule for pipes installation  

The insulation work is done. 

Quote:

The pipes are installed. The insulation for the pipes will be installed on Nov 2, Tuesday 8:30am.

The work area will be the same, they just wrap insulation around the pipe, there should not be a lot of dust.

Quote:

 At 8:30 am, tomorrow, a workman will come in and install two pipes in the lab.

The pipes will be brazed, so no smoke or dust. 

The working area will only above the fume hood near the entrance.

I'll be in the lab during the installing process.

 

 