40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Message ID: 354     Entry time: Fri Sep 10 12:25:34 2010
Author: Frank 
Type: Notes 
Category: Laser 
Subject: construction work done - Laser back on 

workers finished the piping stuff for today but have to come back to connect it to the stuff one floor above. It's not the sprinkler stuff, it's heating water.
So some other guys will show up in the future to drill holes for the sprinkler pipes and installation of the sprinklers.

turned the laser back on

ELOG V3.1.3-