40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Message ID: 339     Entry time: Thu Sep 2 18:54:10 2010
Author: tara 
Type: Notes 
Category: Computers 
Subject: ACAV,RCAV's pds connected to DAQ 

 

ACAV's PD for transmitted beam is connected to PSL1

RCAV's PD for transmitted beam is connected to PSL2

 

 

And now RCAV_RCTRANSPD dropped from ~5.3 to ~5.05

               ACAV_RCTRANSPD dropped from  ~2.5 to ~2.4

ELOG V3.1.3-