Since this morning atleast, I'm not seeing the North Path unstability (see CTN:2565) and the beatnote is stable and calm at the setpoint. Maybe the experiment just needed some distance from me for few days.
So today, I took a general single shot measurement and even after HEPA filers being on at 'Low', the measurement is the lowest ever, especially in the low-frequency region. This might be due to reduced siesmic activity around the campus. I have now started another super beatnote measurement which would take measurement continuously every 10 min is the transmission power from the cavities look stable enough to the code.
there is a new broad bump though arounf 250-300 Hz which was not present before. But I can't really do noise hunting now, so will just take data until I can go to the experiment.
Latest BN Spectrum: CTN_Latest_BN_Spec.pdf
Daily BN Spectrum: CTN_Daily_BN_Spec.pdf
Relevant post:
CTN:2565: North path's buggy nature NOT solved |