40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Wed Sep 4 17:31:19 2019, anchal, Notes, Vacuum, Plan of Action for Vacuum Can Flange replacement 
    Reply  Fri Sep 20 18:34:19 2019, anchal, Notes, Vacuum, Possible reflected lights on upgrade CTNPrompReflectionAfterUpgrade.pdfCTNPrompReflectionAfterUpgrade.zip
Message ID: 2414     Entry time: Wed Sep 4 17:31:19 2019     Reply to this: 2430
Author: anchal 
Type: Notes 
Category: Vacuum 
Subject: Plan of Action for Vacuum Can Flange replacement 

The plan of action has been moved to a new wiki page for better documentation.

https://nodus.ligo.caltech.edu:30889/ATFWiki/doku.php?id=main:experiments:psl:ctn_vacuumcanupgrade

ELOG V3.1.3-