Thu Feb 22 15:15:20 2018, awade, Craig, Misc, Safety, Water leak in the lab
|
Fri Feb 23 13:15:22 2018, awade, Misc, Safety, Water leak in the lab
|
Mon Feb 26 14:16:38 2018, awade, Misc, Safety, Water leak in the lab
|
Wed Feb 28 11:50:21 2018, awade, Misc, Safety, Pipe work scheduled for lab Friday March 2nd
|
Wed Feb 28 13:43:15 2018, awade, Craig, Misc, Safety, Pipe work scheduled for lab Friday March 2nd  
|
|
Message ID: 2111
Entry time: Wed Feb 28 13:43:15 2018
In reply to: 2110
|
Author: |
awade, Craig |
Type: |
Misc |
Category: |
Safety |
Subject: |
Pipe work scheduled for lab Friday March 2nd |
|
|
The lab is all wrapped up and ready to go. I'm trying to get in contact with plumbing to see if we can move the job forward to Thursday.
Edit awade Wed Feb 28 14:58:12 2018: Got throught o Raymond at ext 1252, the job is locked in for Friday morning and can't be moved forward. Hopefully we can get to cleaning the lab by Friday afternoon and reboot for the weekend.
Quote: |
The Caltech plumbing shop called to say they will have all the parts they need to start work Friday morning. There is a bit of masonary work to be done to the down pipe hole. So there will be some dust.
I have ordered materials from McMaster for wrapping the experiment up again. I got extra so we will have a cling-wrap-kit® for the WB labs ready to go in the future. I didn't get a tracking recipt, but the order went through around COB on the 26th. Should be here today or tomorrow.
|
|
|
|
|
|
|
|