Entry  Thu Feb 22 15:15:20 2018, awade, Craig, Misc, Safety, Water leak in the lab 
    Reply  Fri Feb 23 13:15:22 2018, awade, Misc, Safety, Water leak in the lab 
       Reply  Mon Feb 26 14:16:38 2018, awade, Misc, Safety, Water leak in the lab 
          Reply  Wed Feb 28 11:50:21 2018, awade, Misc, Safety, Pipe work scheduled for lab Friday March 2nd 
             Reply  Wed Feb 28 13:43:15 2018, awade, Craig, Misc, Safety, Pipe work scheduled for lab Friday March 2nd IMG_2310.JPGIMG_2311.JPGIMG_2312.JPG
Message ID: 2111     Entry time: Wed Feb 28 13:43:15 2018     In reply to: 2110
Author: awade, Craig 
Type: Misc 
Category: Safety 
Subject: Pipe work scheduled for lab Friday March 2nd 

The lab is all wrapped up and ready to go.  I'm trying to get in contact with plumbing to see if we can move the job forward to Thursday.  

Edit awade Wed Feb 28 14:58:12 2018: Got throught o Raymond at ext 1252, the job is locked in for Friday morning and can't be moved forward.  Hopefully we can get to cleaning the lab by Friday afternoon and reboot for the weekend.

 

 

Quote:

The Caltech plumbing shop called to say they will have all the parts they need to start work Friday morning.  There is a bit of masonary work to be done to the down pipe hole.  So there will be some dust.

I have ordered materials from McMaster for wrapping the experiment up again.  I got extra so we will have a cling-wrap-kit® for the WB labs ready to go in the future. I didn't get a tracking recipt, but the order went through around COB on the 26th.  Should be here today or tomorrow.

 

Attachment 1: IMG_2310.JPG  2.100 MB  | Hide | Hide all
IMG_2310.JPG
Attachment 2: IMG_2311.JPG  1.962 MB  | Hide | Hide all
IMG_2311.JPG
Attachment 3: IMG_2312.JPG  2.424 MB  | Hide | Hide all
IMG_2312.JPG
ELOG V3.1.3-