Message ID: 1920     Entry time: Fri Sep 15 14:33:06 2017
Author: Aidan 
Type: Summary 
Category: Other 
Subject: CTN lab preparation for the plumbing work 

[Aidan, Gabriele, Eric]

We turned off and covered the clean flow bench by the west wall. We also removed the items from off the top on the half closest to that wall. We removed all the cables hanging below the pipe and lay them on the floor.

 

Attachment 1: IMG_0873.JPG  2.569 MB  | Hide | Hide all
IMG_0873.JPG
Attachment 2: IMG_0872.JPG  2.546 MB  | Hide | Hide all
IMG_0872.JPG
Attachment 3: IMG_0871.JPG  2.106 MB  | Hide | Hide all
IMG_0871.JPG
Attachment 4: IMG_0870.JPG  1.702 MB  | Hide | Hide all
IMG_0870.JPG
Attachment 5: IMG_0869.JPG  1.882 MB  | Hide | Hide all
IMG_0869.JPG
Attachment 6: IMG_0868.JPG  2.564 MB  | Hide | Hide all
IMG_0868.JPG
Attachment 7: IMG_0867.JPG  2.013 MB  | Hide | Hide all
IMG_0867.JPG
ELOG V3.1.3-