40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Thu Nov 3 19:59:01 2016, awade, DailyProgress, Other, Power cycle in the lab? 
    Reply  Fri Nov 4 03:21:25 2016, rana, DailyProgress, Other, Power cycle in the lab? 
       Reply  Tue Nov 8 14:46:59 2016, awade, Summary, Other, Power cycle in the lab? 
          Reply  Mon Nov 21 12:39:05 2016, awade, Summary, Other, Power cycle in the lab? 
             Reply  Wed Nov 30 20:04:13 2016, awade, Summary, Other, Power cycle in the lab? 
                Reply  Thu Dec 1 15:18:09 2016, awade, DailyProgress, Electronics Equipment, Power cycle in the lab? 2016-12-01_15.10.52.jpg
Message ID: 1780     Entry time: Wed Nov 30 20:04:13 2016     In reply to: 1772     Reply to this: 1781
Author: awade 
Type: Summary 
Category: Other 
Subject: Power cycle in the lab? 

The APC SMX3000LVNC UPS unit arrived today.  It will need to be tagged and put into the LIGO asset system.

The question is where to locate in lab. Unit can be mounted vertically like a tower computer or rack mounted (obviously at the bottom as it is ~42 kg).  The lasers appear to be powered off a strip down the side of the table. The rest of the essential stuff is in the rack so that would be the place to put it.  There is already a bunch of heavy duty HV power supplies at the bottom of the rack, they will either have to be moved (not a great option) or the UPS might be installed above.  

Not sure how much more it will weigh when I charge it.

 

 

 