40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
PSL |
Not logged in |
 |
|
Thu Nov 3 19:59:01 2016, awade, DailyProgress, Other, Power cycle in the lab?
|
Fri Nov 4 03:21:25 2016, rana, DailyProgress, Other, Power cycle in the lab?
|
Tue Nov 8 14:46:59 2016, awade, Summary, Other, Power cycle in the lab?
|
Mon Nov 21 12:39:05 2016, awade, Summary, Other, Power cycle in the lab?
|
Wed Nov 30 20:04:13 2016, awade, Summary, Other, Power cycle in the lab?
|
Thu Dec 1 15:18:09 2016, awade, DailyProgress, Electronics Equipment, Power cycle in the lab?
|
|
Message ID: 1772
Entry time: Mon Nov 21 12:39:05 2016
In reply to: 1765
Reply to this: 1780
|
Author: |
awade |
Type: |
Summary |
Category: |
Other |
Subject: |
Power cycle in the lab? |
|
|
It appears the acromag1 box was reset again. This might have to do with the flooding in the adjacent ATF lab stopping power there.
I have ordered the APC SMX3000LVNC UPS unit. The UPS tracking says it arrived Wednesday last week. My defults for TechMart punchout were missing the LIGO mail code so stuff is taking a bit longer to get to me through the internal mail system. Should be here this week.
Quote: |
Power budget for essentials.
Power budget PSL lab essentials
|
Number |
Power |
North + south lasers |
2 |
30 W (max 75 W) |
ion Vacuum pump |
1 |
40 W
|
Acromag1 (computer) |
1 |
200 W (300 W max) |
fb2 (computer) |
1 |
300 W |
Marconi 2023A |
2 |
70 W (100 W max)
|
TOTAL |
|
740 W (990 W max)
|
APC SMX3000LVNC unit: battery capaciy 738 Volt-Amp-Hour
At the upper bound of consumption (at start of unit life) this will ride out 45 min blackout.
|
|