40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Thu Nov 3 19:59:01 2016, awade, DailyProgress, Other, Power cycle in the lab? 
    Reply  Fri Nov 4 03:21:25 2016, rana, DailyProgress, Other, Power cycle in the lab? 
       Reply  Tue Nov 8 14:46:59 2016, awade, Summary, Other, Power cycle in the lab? 
          Reply  Mon Nov 21 12:39:05 2016, awade, Summary, Other, Power cycle in the lab? 
             Reply  Wed Nov 30 20:04:13 2016, awade, Summary, Other, Power cycle in the lab? 
                Reply  Thu Dec 1 15:18:09 2016, awade, DailyProgress, Electronics Equipment, Power cycle in the lab? 2016-12-01_15.10.52.jpg
Message ID: 1753     Entry time: Thu Nov 3 19:59:01 2016     Reply to this: 1755
Author: awade 
Type: DailyProgress 
Category: Other 
Subject: Power cycle in the lab? 

Yinzi and I did some stuff in the lab today, she will post this soon.  We've had some kind of power outage.  I had left the south laser on with the loops locked form ~36 hours earlier.  When I came in the laser was back into standby mode and fb2 was off, later in diagnosing why the FSS wasn't locking I found the Marconi settings were reset back to -140 dBm output 0Hz.  

All of this is recoverable, just don't know what happened. I don't remember getting any emails about downtime.

ELOG V3.1.3-