40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Message ID: 170     Entry time: Mon Jun 21 19:19:12 2010
Author: tarac 
Type: Laser 
Category: PMC 
Subject: Progress on PSL setup: Tuning phase shift/RF power for PMC  

All SMA cables for locking RefCav are made and wired up in their places.

We decide to turn the power up to 50mW before it enters PMC. With ~80% efficiency, we get 40 mW out.

I adjusted RF power and phase shift for PMC and saved it in the init file so that next time we reboot the crate, the values will be set.

Next: I'll lock the RefCav and optimize the alignment.

ELOG V3.1.3-