40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Message ID: 1656     Entry time: Fri Jul 1 16:50:35 2016
Author: Aidan, Andrew 
Type: Summary 
Category: DAQ 
Subject: Acromag slow controls back up 

I showed Andrew how to set up the slow controls. We got the previous 3 ADC channels back up.

  • C3:PSL-TRANS_ACAV_ISS_DC
  • C3:PSL-TRANS_RCAV_ISS_DC
  • C3:PSL-TRANS_RF_DC

Also:

  • rewired a few BNC feedthroughs up through the front panel of the Acromag chassis
  • bolted the front panel to the chassis independently of the screws that mount the chassis to the rack

 

Attachment 1: IMG_6196.JPG  957 kB  | Hide | Hide all
IMG_6196.JPG
ELOG V3.1.3-