Entry  Wed Jun 29 15:20:40 2016, Antonio, Notes, BEAT, Plan decided on June 28th 2016 timeline.pdf
    Reply  Thu Jun 30 01:02:08 2016, rana, Notes, Electronics Equipment, New mod freq 
Message ID: 1653     Entry time: Wed Jun 29 15:20:40 2016     Reply to this: 1655
Author: Antonio 
Type: Notes 
Category: BEAT 
Subject: Plan decided on June 28th 2016 

In line with what we already started we decided:

1. Build the North and South optical paths by July 17th (12:59pm) (Antonio North path for now, Andi South path) 

  • Both the paths must to be able to host the PMC, bb-EOM, AOM, and 2 resonant EOM in each of them

2. Week of July 18th beat noise measurements with what we have;

 

A summary with a slight different timing (written before the meeting) is in the following PDF (sorry for the weird layout)

Attachment 1: timeline.pdf  119 kB  | Hide | Hide all
timeline.pdf timeline.pdf timeline.pdf timeline.pdf timeline.pdf