Following the previous elog entry today we succeeded in locking the PMC.
As a reminder this is only a temporary setup. The optical path need to be re-design in order to allow
the implementation of the PMC together with mode matching lenses.
This is the list of things we did today:
- Setup RFPD on the table for the PMC
- Added the EOM on the path (may be temporary, as the mount is not ready)
- Connected the LO to EOM and the PMC card
- Checked Error signal
- Locked the cavity
|