40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Message ID: 1621     Entry time: Tue Apr 5 16:09:54 2016
Author: Antonio 
Type: Notes 
Category: PMC 
Subject: Short time plan 

This is my short time plan rough proposal for the period left of Tara's stay.

1. PMC number 1

- Locking

- Transfer function measurement

2. PMC number 2

- Find the 00 mode

- PZT test

- Finesse measurement (roughly)

- Locking

- Transfer function

 

3. Glass PMC (pzt broken)

Need to take a decision. How to remove the pzt? Do we want to give a try?

 

4. Additional PMC

- Do we want to assemble other PMCs?

ELOG V3.1.3-