This is my short time plan rough proposal for the period left of Tara's stay.
1. PMC number 1
- Locking
- Transfer function measurement
2. PMC number 2
- Find the 00 mode
- PZT test
- Finesse measurement (roughly)
- Locking
- Transfer function
3. Glass PMC (pzt broken)
Need to take a decision. How to remove the pzt? Do we want to give a try?
4. Additional PMC
- Do we want to assemble other PMCs? |