40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Thu Sep 11 21:43:32 2014, Tara, Evan, DailyProgress, ISS, South ISS RINsouth.pdfsouthRIN.zip
    Reply  Sun Sep 14 10:37:57 2014, Evan, DailyProgress, BEAT, New beat noiseBudget.pdf
Message ID: 1513     Entry time: Thu Sep 11 21:43:32 2014     Reply to this: 1514
Author: Tara, Evan 
Type: DailyProgress 
Category: ISS 
Subject: South ISS 

We turned on both ISS loops today.

Here is an in-loop characterization of the south RIN with and without the ISS.

Attachment 1: RINsouth.pdf  185 kB  | Show | Show all
Attachment 2: southRIN.zip  105 kB
ELOG V3.1.3-