40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Thu Aug 1 03:34:35 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 
    Reply  Thu Aug 1 18:33:12 2013, Chloe, DailyProgress, ECDL, Assembling ECDL tempsensor.PNG
       Reply  Fri Aug 2 18:15:06 2013, Chloe, DailyProgress, ECDL, Assembling ECDL possible_tec_mount.PNG
          Reply  Mon Aug 5 18:47:04 2013, Chloe, DailyProgress, ECDL, Assembling ECDL heating.PNGcooling.PNGnoise_beginning.JPG
             Reply  Tue Aug 6 19:48:19 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 100_0079.JPG
                Reply  Wed Aug 7 18:13:21 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 
                   Reply  Thu Aug 8 18:43:44 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 100_0081.JPGcool_bridge.PNGheat_bridge.PNG
                      Reply  Fri Aug 9 18:01:47 2013, Chloe, DailyProgress, ECDL, Assembling ECDL cool_bridge2.PNGheat_bridge2.PNG
                         Reply  Tue Aug 13 18:13:35 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 
                            Reply  Thu Aug 15 18:53:45 2013, Chloe, DailyProgress, ECDL, Assembling ECDL 100_0104.JPG
Message ID: 1299     Entry time: Thu Aug 15 18:53:45 2013     In reply to: 1297
Author: Chloe 
Type: DailyProgress 
Category: ECDL 
Subject: Assembling ECDL 

Quote:

Made some modifications to the Solidworks design. All of these have been changed on the SVN. 

  • Made heat sink for TEC adjustable so it can clamp the TEC element between the heat sink and the laser diode mount, with no risk of it touching the laser diode mount. This was achieved by making a longer hole on the base plate so the heat sink can be screwed on anywhere. The heat sink will be copper because this is very thermally conductive compared to aluminum or other metals. 
  • The laser diode will be thermally isolated from the rest of the setup using a piece of plastic (most likely delrin). 
  • Tara and I found a lens mount we can use which allows for small height adjustments (Newport LA1V-XY, http://search.newport.com/?x2=sku&q2=LA1V-XY). This is at an optic height of 1 inch which works well with our setup. We are going to purchase this (http://search.newport.com/?q=*&x2=sku&q2=LPLH-25T) which is an adapter so that it can hold the 0.25" optic. The collimating lens' distance from the laser diode will be adjustable by the same method as the heat sink - there is a longer hole on the base plate so that the lens mount can be screwed down anywhere. 
  • Added 2 D-sub holes that are properly sized (last time was a bit too small) so that we can plug in the TEC and current driver onto the ECDL box. 

Tomorrow morning I will go to the machine shop to get the base plate and left plate modified, and get them to machine a heat sink and plastic insulator. 

 Today I got the newly machined parts. I put together the TEC element and stuff again and will calibrate the next time I get a chance. 

Erica and I practiced our presentations in front of Tara. I got a lot of feedback and I'm going to edit my presentation in my free time outside of lab. It was also useful to see someone else's work to get an idea of how to present. 

I'm working on putting together a Michelson interferometer to measure the laser diode free running noise. I don't have the actual collimating lens, so I'm using a f=5mm lens from a fiber optic. I have mirrors and I borrowed a beam splitter from the GYRO experiment. Picture below. I'm working on getting the beams to combine by adjusting the mirrors. Will continue doing this tomorrow. 

Attachment 1: 100_0104.JPG  1.170 MB  | Show | Show all
ELOG V3.1.3-