40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  PSL  Not logged in ELOG logo
Entry  Thu May 20 21:50:35 2010, tarac, Laser, Laser, PMC is almost ready to be locked 
    Reply  Mon May 24 09:56:19 2010, rana, Laser, PMC, PMC is almost ready to be locked 
       Reply  Mon May 24 19:30:15 2010, rana, Laser, PMC, PMC is almost ready to be locked 
Message ID: 126     Entry time: Thu May 20 21:50:35 2010     Reply to this: 127
Author: tarac 
Type: Laser 
Category: Laser 
Subject: PMC is almost ready to be locked 

 We still need two SMA cables. One connects between 21.5Mhz EOM and PMC servo card, another one connects between PMC PD and the servo card.

The 21.5 and 35.5 local oscillator were in the wrong slots, we fixed them.

The 21.5 MHz  photo diode that detects the reflected beam from PMC saturates at 15 mW.

Now I'm trying to optimize the PMC setup so that we have maximum transmittedd power.

ELOG V3.1.3-