ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
102
|
Tue Aug 23 08:46:04 2016 |
Gabriele | General | Daily Progress | Daily tests | MO03 - edge polished:
Turbo off, QPD centered, before
excitation (60 seconds) |
|
103
|
Tue Aug 23 09:21:25 2016 |
Gabriele | General | General | Status of Mark Optics disks | We initially received 20 disks (75 mm diameter,
1 mm thickness) from Mark Optics. Here's
their status as of today |
|
104
|
Tue Aug 23 09:44:11 2016 |
Gabriele | General | General | Measurements on MO-02 | Two good ring-downs measurements were performed
on MO-02. The first one was already reported
in a previous elog |
7x |
105
|
Thu Sep 1 02:13:33 2016 |
Gabriele | Optics | Characterization | Expected frequencies for the 75 mm disks with flats | Here are the nominal parameters of the
disk with flats
|
|
106
|
Sun Sep 11 10:05:33 2016 |
Gabriele | General | Daily Progress | New substrate in the chamber | I installed one of the new substrates (with
flats) into the chamber, and started the
pumpdown at about 9:45am LT. |
|
107
|
Mon Sep 12 16:00:06 2016 |
Gabriele | General | Daily Progress | First fully automated measurements of ring down | I finished the first version of the automation
software to measure the ring down of the
disk modes. I tested it with the new substrate |
   |
108
|
Tue Sep 13 10:33:35 2016 |
Gabriele | General | General | Disk excited | Disk excited with white uniform noise,
amplitude 5 V, for some tens of seconds.
Excitation off at |
|
109
|
Wed Sep 14 13:08:05 2016 |
Gabriele | General | General | Ringdown with roughing pump off | At 1:05pm LT I stopped the roughing pump
and started a ring-down measurement. Pump
restarted at 2:18pm LT. |
|
110
|
Wed Sep 14 20:17:33 2016 |
Gabriele | General | General | Band-limited excitation | Excitation started at 20:15:30LT, 20 seconds
long. The excitation is band-limited (10
Hz) centered around each of the predicted |
|
111
|
Thu Sep 15 08:13:20 2016 |
Gabriele | General | General | Pump had no effect on ring down measurements | The plot below shows three measurements
of the Q of the same disk: during the first
two the roughing pump was on, while during |
|
112
|
Thu Sep 15 08:27:57 2016 |
Gabriele | General | General | New band-limited excitation | Same as in elog #110,
but now the amplitude is proportional to
frequency squared: |
|
113
|
Thu Sep 15 11:23:13 2016 |
Gabriele | Facility | General | Chamber open | Turbo pump off and spinning down at 9:37am
LT. Pumo completely stopped at 11:15am LT
Openend the chamber and removed |
|
114
|
Thu Sep 15 15:15:10 2016 |
Gabriele | General | General | Edge effect on losses | I made a COMSOL model that can compute
the distribution of elastic energy for each
mode, dividing it into: |
  |
115
|
Fri Sep 16 14:06:43 2016 |
Gabriele | General | General | Pump had no effect on ring down measurements | Same plot as below, but this time with
estimated 95% confidence intervals for the
Q values, as obtained from the fit only. |
|
116
|
Tue Sep 20 15:34:00 2016 |
Gabriele | Optics | Daily Progress | Improved optical lever layout | Goal
Improve the optical setup,
by increasing the response of the QPD to
disk motion. |
   |
117
|
Tue Sep 20 16:12:09 2016 |
Gabriele | General | General | Pump down | As a test, I installed MO1 (the disk with
the burn mark, used for the first edge laser
polishing test) and started pumping down. |
|
118
|
Tue Sep 20 16:43:58 2016 |
Gabriele | General | General | Excitation and ring down | The pressure is at abour 3e-6 Torr. I centered
the QPD and started an excitation. The HV
amplifier manual states that the driver can |
|
119
|
Wed Sep 21 08:12:13 2016 |
Gabriele | General | General | Excitation and ring down | New excitation (2000V) at about 8:06am.
Had to recenter the QPD again after the excitation.
Engaged the 500Hz high pass filter |
|
120
|
Wed Sep 21 14:42:47 2016 |
Gabriele | General | General | Serialized (etched) disk installed | Just for fun, I installed the disk thas
has been etched in the center with "1234".
I figured out that the ESD PCB was probably |
|
121
|
Thu Sep 22 09:49:21 2016 |
Gabriele | General | General | Ring-down of etched disk | QPD centerd, quiet data, light off, one
minute from
PDT: 2016-09-22 09:46:29.393609 |
|
122
|
Thu Sep 22 13:39:40 2016 |
Gabriele | Optics | Configuration | Updated design for the new C.Ri.Me. setup | Today I measured the amount of space available
on the table for the new (4-fold) C.Ri.Me.
setup. It's 1050 x 1220 mm, with the |
|
123
|
Thu Sep 22 15:00:49 2016 |
Gabriele | Electronics | Configuration | Epics values now saved to frames | I was looking at some past trend data and
discovered that EPICS values were not written
to the frames. I added the following two |
|
124
|
Fri Sep 23 08:11:48 2016 |
Gabriele | Mechanics | Daily Progress | Test of the disk retaining ring motion | In brief, it doesn't work. The magnets
and coils are strong enough to push up the
ring with a sample inside, but the friction |
|
125
|
Fri Sep 23 08:33:39 2016 |
Gabriele | Electronics | Configuration | Epics values now saved to frames | Now EPICS values are saved to frames, but
they are all zero! I noticed that we always
had the same problems with the cymac2 too. |
|
126
|
Mon Sep 26 15:54:01 2016 |
Gabriele | Facility | Configuration | Moved vacuum controllers | I moved the turbo pump controller out of
the clean room. Also, I installed the gauge
controller on the Cymac rack. |
|
127
|
Mon Sep 26 15:59:09 2016 |
Gabriele | Optics | Daily Progress | QPD auto centering | We have a few motorized mounts (with New
Focus picomotors) and one controller (an
old New Focus 8753, six axis total) that |
  |
128
|
Tue Sep 27 08:53:46 2016 |
Gabriele | General | Vacuum | Etched disk installed | Installed the etched disk: using manually
the centering ring allowed me to get the
beam on the QPD. A couple of taps to the |
|
129
|
Tue Sep 27 14:54:53 2016 |
Gabriele | Electronics | Configuration | Epics values now saved to frames | Apparently, there was a mismatch in the
configuration, and DAQD was adding a wonderful
16 Hz comb all over the spectrum. |
|
130
|
Tue Sep 27 15:10:59 2016 |
Gabriele | General | Measurements | Ring-down of etched disk | Quiet (roughing pump off, lights off):
60 seconds from
PDT: 2016-09-27 15:05:30.805667 PDT |
|
131
|
Wed Sep 28 10:26:58 2016 |
rana | General | General | references on ideal glasses | Some easy to read reviews on
thin films and ideal glass for people getting
started in this Q measuring game.
|
|
132
|
Thu Sep 29 15:40:45 2016 |
Gabriele | Optics | Design | Beam profile of new 21mW HeNe laser and tweak of optical lever design | I measured the beam profile of the new
Thorlabs HeNe (21.8 mW measured). The beam
waist is 355 microns, very close to the laser |
|
133
|
Mon Oct 17 10:50:50 2016 |
Gabriele | General | Vacuum | No sign of problems in the electrostatic drive | I opened the chamber and took the etched
disk out. Inspection of the electrostatic
drive does not show any sign of burn or damage. |
|
134
|
Tue Oct 18 16:29:37 2016 |
Gabriele | General | Measurements | S1600433 | S1600433, annealing run 10/10/2016
Installation
Installed
in the measurement system, chamber closed
pump
down started at 4:27pm LT
turbo |
17x |
135
|
Tue Oct 18 16:52:16 2016 |
Gabriele | General | Measurements | Sample inspections from annealing run 10/10/2016 | LIGO-T1600466
S1600432 shows some residual
on face, close to the edge, probably from |
|
136
|
Wed Oct 19 13:35:23 2016 |
Gabriele | General | Measurements | S1600438 | S1600438, not annealed, as received
from Mark Optics
Installation
Turbo
pump switched off at 11:42am (2016-10-19)
Turbo |
    |
137
|
Wed Oct 19 16:40:24 2016 |
sults: | General | Measurements | S1600349 | S1600439, not annealed, as received
from Mark Optics
Installation
installed
and balanced, pump down started at 4:38pm |
10x |
138
|
Wed Oct 19 17:08:47 2016 |
Gabriele | General | Measurements | S1600433 vs S1600438 |
S1600433 has been annealed, was
contaminated by the iron oxide, and it was
cleaned using first contact. No residual |
|
139
|
Thu Oct 20 11:04:03 2016 |
Gabriele | General | Measurements | Sample with flame polished edges | Sample with edges flame polished in Glasgow
Installation
into
the chamber and balanced at 11am. Pump down
started at 11:00am.
it looks like |
7x |
140
|
Thu Oct 20 14:38:24 2016 |
Gabriele | Clean | Daily Progress | Cleaning of S1600433 and S1600438 | Samples #433 (annealed and cleaned) and
#438 (as received from Mark Optics) are now
with GariLynn for deep cleaning. |
|
141
|
Fri Oct 21 13:45:21 2016 |
Gabriele | General | Measurements | S1600447 | Sample S1600447, as received from Mark
Optics, second batch
Measurements
Installed
into the chamber, pumping down started at |
13x |
142
|
Fri Oct 21 14:03:17 2016 |
Gabriele | General | Vacuum | Roughing pump moved | I moved the roughing pump out of the clean
room, adding an extension hose.
|
 |
143
|
Fri Oct 21 15:27:15 2016 |
Gabriele | Electronics | Configuration | Removed low pass filter in SUM | I removed the low pass filter in the QPD
SUM signal, used for normalization. This
reduced a lot the bump at ~20kHz due to laser |
|
144
|
Mon Oct 24 10:26:30 2016 |
Gabriele | General | Measurements | S1600439 | S1600439, post annealing
Measurements
before annealing reported in elog 137. |
   |
145
|
Mon Oct 24 14:33:46 2016 |
Gabriele | General | Measurements | Effect of annealing: Q increases | S1600439 has been measured as received
(before annealing, elog
137) and after annealing (elog |
|
146
|
Mon Oct 24 16:32:01 2016 |
Gabriele | General | Measurements | S1600448 | Sample S1600447, as received from
Mark Optics, second batch
in
chamber, pumping down at 4:30pm (2016-10-24)
pumps |
9x |
147
|
Tue Oct 25 09:12:31 2016 |
Gabriele | General | Measurements | Comparison of first and second batch | The plot below compares a sample from the
first batch and two samples from the second
batch. All samples are as received from Mark |
6x |
148
|
Tue Oct 25 11:10:37 2016 |
Gabriele | General | Measurements | Image of S1600433 | This is an image of the sample S1600433
under the microscope, courtesy of GariLynn:
Link |
|
149
|
Thu Oct 27 14:02:38 2016 |
Alena | General | General | Annealing | Annealing run (447-448) on 3" wafers
- Crime 10/27/2016 https://dcc.ligo.org/T1600485-v1
|
|
150
|
Fri Oct 28 21:20:48 2016 |
Gabriele | General | Measurements | S1600447 post annealing | Installation
I had some problems
in installing the wafer. I balanced it and
started the pump down a couple of times, |
6x |
151
|
Sat Oct 29 10:12:39 2016 |
Gabriele | General | Measurements | S1600448 post annealing | 2016-10-29
venting
at 10:00am 10/29
sample installed,
pumping down started at 10:12am, turbo pump |
9x |