ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
409
|
Tue Aug 15 16:43:58 2017 |
Zach | Electronics | Modeling | Unchanged Mode Insight | 2017-08-15
It appears
to me that the major factor limiting the
improvement of the modes that either remain |
  |
358
|
Thu Jun 29 13:15:01 2017 |
Alastair, Gabriele | General | General | Laser polishing | We laser polished S1600546, 547, 548, 549,
550 and 551 |
|
33
|
Fri Jul 8 15:26:37 2016 |
Alena | Facility | Daily Progress | Vacuum chamber tests | Fixed the 307 gauge controller (a missing
contact on the rair panel). The low pressure
gauge was connected to 1G port and has measured |
 |
36
|
Mon Jul 11 14:56:45 2016 |
Alena | Facility | Daily Progress | Vacuum chamber tests | Installed a gate valve between the roughing
and tubbo pump. See below a pump down curve.
The convection gauge is not calibrated. the |
|
38
|
Mon Jul 11 17:04:06 2016 |
Alena | Facility | Daily Progress | Vacuum chamber tests | At 5pm the pressure was 6.5e-6 torr.
Checked again at:
9am, pressure was 2e-6 |
|
41
|
Thu Jul 14 16:56:00 2016 |
Alena | Facility | Daily Progress | test vacuum system | Please see prosidures for pumping down
and venting with air for the test vacuum
chamber here |
|
68
|
Thu Jul 28 14:01:27 2016 |
Alena | General | Daily Progress | Clean room | Ordered the clean room (hardware+hepa filters)
and vacuum gauges |
|
149
|
Thu Oct 27 14:02:38 2016 |
Alena | General | General | Annealing | Annealing run (447-448) on 3" wafers
- Crime 10/27/2016 https://dcc.ligo.org/T1600485-v1
|
|
160
|
Fri Nov 4 16:16:23 2016 |
Alena | General | General | Annealing run | Annealing run (454-459) on 3" wafers
- Crime 11/02/2016 https://dcc.ligo.org/LIGO-T1600510
Annealing
run (460-465) on 3" wafers - Crime 11/04/2016 |
|
210
|
Wed Nov 23 14:16:59 2016 |
Alena | General | General | Microscope inspection | Microscope inspection of samples:
S1600487 https://dcc.ligo.org/S1600487-v7
S1600438 https://dcc.ligo.org/S1600438 |
|
263
|
Wed Jan 18 14:29:16 2017 |
Alena | General | Annealing | Annealing run (489-490) on 3" wafers - Crime 01/18/2017 |
Started annealing run Annealing run
(489-490) on 3" wafers - Crime 01/18/2017 |
 |
264
|
Thu Jan 19 07:32:33 2017 |
Alena | General | Vacuum | New chamber first pimp down | The new chamber was build. The first attempt
to pump down was unsuccessful because of
dislocated lid. After the lit was placed |
|
267
|
Thu Jan 19 14:27:02 2017 |
Alena | General | Vacuum | First vacuum test new chamber | Turbo pump controller (new chamber) was
configured. Need to reduce the frequency
or setup a standby mode. First pump down: |
|
269
|
Fri Jan 20 16:00:36 2017 |
Alena | General | Annealing | Annealing run (491-496) on 3" wafers - Crime 01/20/2017 | Started Annealing run (491-496) on
3" wafers - Crime 01/20/2017 https://dcc.ligo.org/LIGO-T1700036
Will be done by Monday |
|
350
|
Wed Jun 21 17:04:20 2017 |
Alena | General | Annealing | Annealing run (541-542) on 3" wafers - Crime 06/25/2017 | Started an annealing run https://dcc.ligo.org/LIGO-T1700271
Will be ready by Friday morning
|
|
355
|
Tue Jun 27 09:20:16 2017 |
Alena | General | Annealing | Annealing run (546-551) on 3" wafers - Crime 06/27/2017 | Started annealing run https://dcc.ligo.org/T1700293
Will be ready by June 28th afternoon |
|
511
|
Wed Apr 4 16:36:15 2018 |
Alena | General | Measurements | S1600551, S1600552, S1600554, S1600555 | 2018-04-04
16:10am
in chamber
S1600551 in CR1
S1600552
in CR2
S1600554 in CR3
S1600555 |
|
515
|
Mon Apr 9 15:34:57 2018 |
Alena | General | Measurements | S1800634 | 2018-04-09
3:30 pm
in chamber
S1800634 in CR1
3:30
pm roughing pump on
3:45 pm turbo |
|
523
|
Tue May 1 16:25:47 2018 |
Alena | General | Measurements | S1800516 | 2018-05-01
16:10 pm
in chamber
S1800516 in CR0
16:20
pm roughing pump on
16:40 pm turbo |
|
524
|
Wed May 2 10:08:20 2018 |
Alena | General | Measurements | S1800520 | 2018-05-02
10:05 am
in chamber
S1800520 in CR0
10:06
am roughing pump on
10:20 am |
|
525
|
Thu May 3 17:37:18 2018 |
Alena | General | Measurements | S1800520 | 2018-05-02
17:37 added
ND because QPD was oversaturated. Repeating
the measurement without venting
S1800520 |
|
526
|
Fri May 4 13:54:55 2018 |
Alena | General | Measurements | S1800516 AK_01 AK_03 | 2018-05-04
02:21
pm in chamber:
AK_01 in CR1
AK_03
in CR3
02:25 pm |
|
527
|
Wed May 9 13:57:41 2018 |
Alena | General | Measurements | S1800515 | 2018-05-09
01:57 pm in chamber:
S1800515
in CR0
01:58 pm |
|
528
|
Thu May 10 10:20:08 2018 |
Alena | General | Measurements | S1600593, S1600594, S1600595, S1600596, S1800519 | 2018-04-04
12:09 pm
in chamber
S1600593 in CR1
S1600594
in CR2
S1600595 in CR3
S1600596 |
|
529
|
Fri May 11 14:27:54 2018 |
Alena | General | Measurements | S1600597 S1600598 S1600599 S1600600 S1800516 |
02:27 pm in chamber
S1600597
in CR1
S1600598 in CR2
S1600599
in CR3
S1600600 in CR4
02:27 |
|
530
|
Mon May 14 13:42:42 2018 |
Alena | General | Measurements | S1800520 |
01:41 pm in chamber
S1800520
in CR0
01:41 pm
roughing pump on
01:59 pm turbo |
|
531
|
Tue May 15 15:10:52 2018 |
Alena | General | Measurements | S1600587 S1600588 |
03:10 pm in chamber
S1600587
in CR1
S1600588 in CR2
03:10
pm roughing pump on
03:24 pm turbo |
|
532
|
Fri May 18 17:06:28 2018 |
Alena | General | Measurements | S1600528 S1600531 S1600543 S1600544 |
16:57 in chamber
S1600528
in CR1
S1600531 in CR2
S1600543
in CR3
S1600544 in CR4
16:57 |
|
533
|
Mon May 21 11:01:36 2018 |
Alena | General | Measurements | S1600609 S1600611 S1600612 S1600613 |
11:00 in chamber
S1600609in
CR1
S1600611 in CR2
S1600612
in CR3
S1600613 in CR4
11:15 |
|
534
|
Tue May 22 08:40:45 2018 |
Alena | General | Measurements | S1600587 S1600588 S1600614 |
09:04 in chamber
S1600587
in CR1
S1600588 in CR2
S1600614
in CR3
09.15 roughing |
|
535
|
Tue May 22 16:11:45 2018 |
Alena | General | Measurements | S1600526 S1600553 S1600557 S1600558 |
16:39 in chamber
S1600526
in CR1
S1600553 in CR2
S1600557
in CR3
S1600558 in CR4
16:39 |
|
536
|
Fri Jun 1 17:46:19 2018 |
Alena | General | Measurements | S1800617 |
17:40 pm in chamber
S1800617
in CR0
17:45 roughing
pump on
17:57 turbo pump on
|
|
537
|
Sat Jun 2 16:23:20 2018 |
Alena | General | Measurements | S1800618 |
16:20 in chamber
S1800618
in CR0
16:20 roughing
pump on
16:30 turbo pump on
|
|
538
|
Sun Jun 3 14:45:51 2018 |
Alena | General | Measurements | S1800619 |
14:45 in chamber
S1800619
in CR0
14:45 roughing
pump on
14:55 turbo pump on
|
|
539
|
Thu Jun 7 14:41:53 2018 |
Alena | General | Measurements | S1800620 |
14:41 in chamber
S1800620
in CR0
14:45 roughing
pump on
14:54 turbo pump on
|
|
540
|
Mon Jun 11 14:18:29 2018 |
Alena | General | Measurements | S1600541 |
14:18 in chamber
S1600541
in CR1
14:18 roughing
pump on
14:23 turbo pump on
|
|
541
|
Fri Jun 22 10:51:46 2018 |
Alena | General | Measurements | S1600594, S1600595, S1600597, S1600598 |
10:50 am in chamber
S1600594
in CR1
S1600595in CR2
S1600597
in CR3
S1600598 in CR4
10:50 |
|
542
|
Fri Jun 22 10:53:06 2018 |
Alena | General | General | Laser failure | One of the HeNe lasers died (the one for
measuring slots CR2 and CR4). It had no outgoing
light when I came in this morning. I connected |
 |
543
|
Sat Jun 23 21:15:15 2018 |
Alena | General | Measurements | S1600594, S1600595, S1600597, S1600598 | Repeating the previous measurement after
correcting the alignement. Did not vent the
chamber. |
|
545
|
Mon Jun 25 16:17:14 2018 |
Alena | General | Measurements | S1600584, S1600599, S1600591 |
16:18 in chamber
S1600584
in CR1
S1600599 in CR2
S1600591
in CR3
16:28 roughing |
|
546
|
Wed Jun 27 18:27:46 2018 |
Alena | General | Measurements | S1600597, S1600598, S1600599 |
18:27 in chamber
S1600597
in CR1
S1600598 in CR2
S1600599
in CR3
18:28 roughing |
|
547
|
Thu Jun 28 17:40:59 2018 |
Alena | General | Measurements | S1600594, S1600595 |
18:01 in chamber
S1600594
in CR1
S1600594 in CR2
18:09
roughing pump on
18:13 turbo pump |
|
548
|
Fri Jun 29 10:52:00 2018 |
Alena | General | Measurements | S1800614 S1800618 S1800619 S1600600 |
11:01 in chamber
S1800614
in CR1
S1800618 in CR2
S1800619
in CR3
S1600600 in CR4
11:10 |
|
549
|
Fri Jul 6 19:43:54 2018 |
Alena | General | Measurements | S1800614 S1800619 S1600600 |
19:30 in chamber
S1800614
in CR1
S1800618 in CR2
S1600600
in CR4
19:40 roughing |
|
551
|
Wed Jul 25 11:23:44 2018 |
Alena | General | General | CR14 re-alignement | Aligned CR14 chamber back to 3" disks. |
|
552
|
Wed Jul 25 11:24:51 2018 |
Alena | General | Measurements | S1600561, S1600562, S1600563, S1600564 |
12:20 pm in chamber
S1600561
in CR1
S1600562in CR2
S1600563
in CR3
S160056 in CR4
12:20 |
|
553
|
Thu Jul 26 14:55:53 2018 |
Alena | General | Measurements | S1600571, S1600572 |
14:30 in chamber
S1600571
in CR1
S1600572 in CR2
14:40
roughing pump on
14:50 turbo pump |
|
554
|
Thu Jul 26 15:33:00 2018 |
Alena | General | General | New laser instaled for the old chanber cr0 | Installed a new HeNe laser for the old
chamber cr0. No major alignement was required.
The laser mount restored the alinement. Will |
   |
555
|
Thu Jul 26 15:35:48 2018 |
Alena | General | Measurements | S1800620 |
15:20 in chamber
S1800620
in CR0
15:30 roughing
pump on
15:45 turbo pump on
|
|
556
|
Fri Jul 27 18:06:49 2018 |
Alena | General | Measurements | S1600641, S1600642, S1600643, S1600644 |
17:50 in chamber
S1600641
in CR1
S1600642 in CR2
S1600643
in CR3
S1600644 in CR4
18:04 |
|