40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog, Page 18 of 18  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Thu Aug 17 14:19:04 2017, Zach, Electronics, Modeling, Two ESD Optimization 17x
Entry  Wed Feb 8 17:01:01 2017, Gabriele, Optics, Daily Progress, Two laser installed, setup aligned photo_setup_new.png
    Reply  Thu Feb 9 09:30:52 2017, Gabriele, Optics, Daily Progress, Two laser installed, setup aligned Screenshot.png
Entry  Tue Aug 15 16:43:58 2017, Zach, Electronics, Modeling, Unchanged Mode Insight Double.pdfThin.pdfOriginal.pdf
Entry  Tue Dec 12 15:35:27 2017, Gabriele, General, Measurements, University Wafers substrates (76.2mm/0.5mm) annelaed 
Entry  Thu Sep 22 13:39:40 2016, Gabriele, Optics, Configuration, Updated design for the new C.Ri.Me. setup crime_v2.pdf
Entry  Fri Mar 10 16:44:13 2017, Gabriele, Optics, Daily Progress, Updated in vacuum periscope of CR0 
Entry  Wed Jul 27 15:43:02 2016, Gabriele, Facility, Daily Progress, Vacuum chamber dismantled and ready for cleaning 2016-07-27_15.34.10.jpg
Entry  Thu Jul 7 17:44:11 2016, Gabriele, Facility, Daily Progress, Vacuum chamber tests 2016-07-07_14.33.34.jpg2016-07-07_14.35.21.jpg2016-07-07_15.55.19.jpg2016-07-07_14.35.26.jpg2016-07-07_15.01.22.jpg
Entry  Fri Jul 8 15:26:37 2016, Alena, Facility, Daily Progress, Vacuum chamber tests WP_20160708_12_25_35_Pro.jpgWP_20160708_12_25_41_Pro.jpg
Entry  Mon Jul 11 14:56:45 2016, Alena, Facility, Daily Progress, Vacuum chamber tests 20160711.png
    Reply  Mon Jul 11 17:04:06 2016, Alena, Facility, Daily Progress, Vacuum chamber tests 
Entry  Tue Jul 19 17:15:37 2016, Gabriele, Facility, Daily Progress, Vacuum pressure acquired 
Entry  Mon Nov 14 11:28:33 2016, Gabriele, General, Vacuum, Viton pads 2016-11-14_10.41.47.jpg2016-11-14_10.41.57.jpgviton.png
Entry  Wed Feb 1 15:23:42 2017, Gabriele, Optics, Noise hunting, Wandering line is due to the laser laser_noise_rin.pngUntitled.avi
Entry  Sun Aug 21 13:45:56 2016, Gabriele, Optics, Daily Progress, Wierd behavior of ring downs and Improved setup second_ring_downs.pngthird_ring_downs.png2016-08-21_08.46.11.jpg2016-08-21_13.29.24.jpg2016-08-21_13.29.32.jpg
Entry  Wed Aug 16 14:35:05 2017, Gabriele, General, Computers, Workstation is down 
    Reply  Fri Aug 18 14:05:36 2017, Gabriele, General, Computers, Workstation is now up 
Entry  Fri Mar 30 19:12:15 2018, Gabriele, General, Measurements, Zirconia S1600519 S1600522 S1600565 
Entry  Fri Jul 13 10:34:35 2012, janosch, Optics, Characterization, camera image 
    Reply  Wed Feb 1 15:35:30 2017, Gabriele, General, Daily Progress, excitation not working - FIXED 
Entry  Wed Jul 18 18:43:34 2012, janosch, Optics, Characterization, gone with the wind Purple.avi
Entry  Tue Jul 17 18:32:11 2012, janosch, Optics, Characterization, purple images Red_30deg.pngPurple_30deg.png
Entry  Fri Jul 20 18:35:42 2012, janosch, Optics, Characterization, purple improvements and first uncalibrated BSDF curves Purple.mp4Red.mp4Purple_BSDF.pngRed_BSDF.png
Entry  Fri Oct 12 16:23:20 2012, janosch, Optics, Daily Progress, reassembled setup 
Entry  Wed Sep 28 10:26:58 2016, rana, General, General, references on ideal glasses 
Entry  Wed Jul 11 23:01:01 2012, janosch, Optics, Characterization, starting the multi-color scatter experiment DSCF3148.JPGDSCF3151.JPGDSCF3150.JPG
Entry  Tue Jul 24 10:59:59 2012, janosch, Optics, Characterization, sum of purple and red ImageSum.png
Entry  Thu Jul 14 16:56:00 2016, Alena, Facility, Daily Progress, test vacuum system 
Entry  Fri Jul 13 20:53:35 2012, janosch, Optics, Characterization, two images Green.pngRed.png
ELOG V3.1.3-