ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
81
|
Sat Aug 13 11:17:17 2016 |
Gabriele | Facility | Daily Progress | Spot the differences | |
 |
80
|
Fri Aug 12 10:33:14 2016 |
Gabriele | Electronics | Configuration | Storage added to cymac3 | Installed two new 2TB disks into the cymac3.
Also, the main disk has a 1TB partition with
the operating system, so I created a new |
|
79
|
Thu Aug 11 10:59:39 2016 |
Gabriele | Electronics | Configuration | Quadrant calibration | I cross checked the calibration of the
sum channel with a power meter. Now
all quadnant signals X3:Q?_OUT and the sum |
|
78
|
Thu Aug 11 09:10:01 2016 |
Gabriele | Electronics | Configuration | Real time model | Compiled and installed an updated real
time model. It acquires the four QPD segments,
compute sum and differences, and normalize. |
  |
77
|
Thu Aug 11 08:45:19 2016 |
Gabriele | General | General | QPD signals with dielectric filter | I installed a dielectric laser line filter
(Thorlabs FLH05633-5, center wavelength 633
nm, FWHM 5 nm) in front of the QPD. In this |
 |
76
|
Wed Aug 10 10:04:35 2016 |
Gabriele | Mechanics | Daily Progress | The prototype of the disk retain system is here | Yesterday we received the prototype of
the disk suspension and retain system. Everything
looks good. I checked that the disk fits |
6x |
75
|
Wed Aug 10 09:39:38 2016 |
Gabriele | Electronics | Daily Progress | Annuntio vobis gaudium magnum: habemus Cymac | Yesterday I cloned the cymac2 disk and
installed it into the cymac3.
Jamie tweaked a few things (I can't |
|
74
|
Mon Aug 8 10:42:46 2016 |
Gabriele | General | General | Dependency of eigenmode frequencies on thickness and diameter | I ran a set of COMSOL simulations to determine
the dependency of the frequency of each eigenmode
on the disk thickness and diameter, within |
26x |
73
|
Tue Aug 2 16:00:32 2016 |
Gabriele | Electronics | Characterization | More on the signal jumps | So I’m
sending a 1.123 Hz sinusoid into the ADC, |
  |
72
|
Tue Aug 2 15:58:12 2016 |
Gabriele | Electronics | Daily Progress | Six QPD functional and tested | I finished populating the new four QPD
boards, and fixed the first one I populated
weeks ago. I tested all five new boards: |
|
71
|
Mon Aug 1 16:56:57 2016 |
Gabriele | Electronics | Daily Progress | Populated four new QPD boards | Today I populated four more QPD boards.
All components are installed, except for
the QPD themselves. |
|
70
|
Fri Jul 29 14:08:31 2016 |
Gabriele | General | Daily Progress | Peak tracking code for real time model | Summary
I wrote a C function
to reconstruct the amlplitude and frequency
of a line. It can be added as a block into |
  |
69
|
Thu Jul 28 17:15:22 2016 |
Gabriele | Electronics | Daily Progress | ADC/DAC interfaces upgrade | Installed the ADC and DAC boards into a
proper box. Also, swapped the temporary DAC
board (with cale hack) with the final one. |
 |
68
|
Thu Jul 28 14:01:27 2016 |
Alena | General | Daily Progress | Clean room | Ordered the clean room (hardware+hepa filters)
and vacuum gauges |
|
67
|
Thu Jul 28 13:58:48 2016 |
Alena, Gabriele | Clean | Daily Progress | The old chamber is now being cleaned and baked | Cleaned the chamber in the washing machine
at 40m and started 48 baking at 120 C |
|
66
|
Wed Jul 27 15:43:02 2016 |
Gabriele | Facility | Daily Progress | Vacuum chamber dismantled and ready for cleaning | [Alena, Gabriele]
As decided at out Red Door meeting,
we're going to clean the vacuum chamber |
|
65
|
Wed Jul 27 11:27:11 2016 |
Gabriele | Facility | General | Pumps stopped and venting | 11:25am LT: closed valve between roughing
and turbo pumps, switched off both pumps.
Turbo pump is slowing down |
    |
64
|
Wed Jul 27 10:19:36 2016 |
Gabriele | Electronics | Configuration | Last finding in the signal jump saga | This plot shows a signal which is generated
purely digitally inside a code that I was
testing. |
  |
63
|
Wed Jul 27 08:59:12 2016 |
Gabriele | Electronics | General | Pressure now in torr | The old channel X3:CR1-PRESSURE_LOGTORR
does not exist anymore. The new channel is
now directly in torr and it is called X3:CR1-PRESSURE_TORR. |
|
62
|
Tue Jul 26 11:45:03 2016 |
Gabriele | Electronics | Characterization | High frequency noise budget | Just to confirm that my noise estimates
make sense, here's a plot of the not-normalized
QPD signal that gives the X motion (sum and |
  |
61
|
Mon Jul 25 17:44:13 2016 |
Gabriele | Electronics | Characterization | High frequency noise budget | I measured the noise sources limiting the
QPD sensitivity. Unfortunately, I had to
do some MATLAB tricks to get rid of the glitches: |
 |
60
|
Mon Jul 25 15:35:31 2016 |
Gabriele | Optics | Characterization | Calibration of the QPD in physical units | The
equations below are wrong. Please refer to https://nodus.ligo.caltech.edu:8081/CRIME_Lab/116 |
   |
59
|
Mon Jul 25 12:24:06 2016 |
Gabriele | Electronics | Configuration | More on the signal jumps | Here are two more tests I did this morning
removed the DAC card from
the cymac and the models, and restarted everything: |
 |
58
|
Fri Jul 22 14:22:10 2016 |
Gabriele | Electronics | Configuration | Investigations on the signal jumps | [Rolf, Ben, Rich, Gabriele]
Rolf couldn't find any good
explanation on the software side for the |
 |
57
|
Thu Jul 21 14:58:26 2016 |
Gabriele | Electronics | General | Glitches are of digital origin | So here's the final proof that the
glitches I see are digital:
There is a positive jump |
 |
56
|
Thu Jul 21 12:10:14 2016 |
Gabriele | General | Daily Progress | Glitch hunting | Yesterday I could clearly see the glitches
as jumps in the time domain plot of X and
Y signals, and trace them to somewhat harder |
  |
55
|
Wed Jul 20 10:26:40 2016 |
Gabriele | Electronics | Configuration | Are glitches a digital artifact? | Not so sure anymore...
those glitches do not happen
at regular times
I tried to send |
|
54
|
Tue Jul 19 20:19:38 2016 |
Gabriele | Electronics | Configuration | Glitches are a digital artifact | The glitches I saw in the data happens
roughly every second, even though not
exactly on the second. They are suddend jumps |
   |
53
|
Tue Jul 19 17:21:48 2016 |
Gabriele | General | Daily Progress | First modes excited! | We can't generate any arbitary signal
with the real time model, since awg is not
working properly yet. For the moment being |
|
52
|
Tue Jul 19 17:15:37 2016 |
Gabriele | Facility | Daily Progress | Vacuum pressure acquired | [Alena, Gabriele]
We connected the analog output
of the vacuum gauge controller to one of |
|
51
|
Mon Jul 18 18:05:46 2016 |
Gabriele | Optics | Daily Progress | Optical setup | Small modifications to the optical setup:
added a 1m focal lenght
lens (AR coated for 1064nm...) right before |
|
50
|
Mon Jul 18 17:48:58 2016 |
Gabriele | Electronics | Configuration | Status of real time system and workstation | [EricQ, Gabriele]
The real time system seems to be
working properly, except for the excitations: |
|
49
|
Mon Jul 18 17:46:04 2016 |
Gabriele | General | Daily Progress | First look at QPD signals | Here's the first spectrum of the QPD
X and Y signals, acquired with the digital
system. Roughing and turbo pumps are still |
|
48
|
Mon Jul 18 14:29:07 2016 |
Gabriele | General | Daily Progress | Status of the test setup | I checked that the QPD electronics works
as expected, and that I can acquire the signals
using the ADCs. A new model (x3cr1) is up |
 |
47
|
Mon Jul 18 13:42:46 2016 |
Gabriele | Electronics | Characterization | QPD signal convention | The QPD quadrants are wired accoridng to
the following convention
|
 |
46
|
Mon Jul 18 13:39:45 2016 |
Gabriele | Facility | Daily Progress | Pump down started | Today at 1:40pm pressure is 8.5e-7 Torr
|
|
45
|
Sat Jul 16 14:15:44 2016 |
Gabriele | Facility | Daily Progress | Pump down started | Following Alena's
procedure, at about 1:30pm LT I started
the chamber pump down. At 14:15pm LT the |
|
44
|
Fri Jul 15 17:56:50 2016 |
Gabriele | General | Daily Progress | QPD connected to digital system | I connected the QPD to the ADC interface
with a temporary cable running on the floor.
I could get signals. I still have |
|
43
|
Fri Jul 15 16:05:07 2016 |
Gabriele | Electronics | Daily Progress | Electrostatic actuator installed | Using the already installed high voltage
feedthrough, I cabled one of the electrostatic
actuators (1mm gap between electrodes) and |
   |
42
|
Thu Jul 14 17:06:47 2016 |
Gabriele | Electronics | Configuration | Networking | The laboratory workstation is coatings.ligo.caltech.edu
The RTS is cymac3.ligo.caltech.edu
I set up a ssh-mount of the /opt/rtcds/userapps |
|
41
|
Thu Jul 14 16:56:00 2016 |
Alena | Facility | Daily Progress | test vacuum system | Please see prosidures for pumping down
and venting with air for the test vacuum
chamber here |
|
40
|
Thu Jul 14 15:30:48 2016 |
ericq | Electronics | Configuration | Cymac RTS configuration | We played around a bit with the cymac,
in efforts to make things better.
We disabled some more fancy-sounding |
|
39
|
Tue Jul 12 17:19:07 2016 |
Gabriele | Electronics | Daily Progress | ADC and DAC cabling | This afternoon I completed the assembly
of the electronics boards to interface the
ADC and DAC. The ADC is interfaced with a |
  |
38
|
Mon Jul 11 17:04:06 2016 |
Alena | Facility | Daily Progress | Vacuum chamber tests | At 5pm the pressure was 6.5e-6 torr.
Checked again at:
9am, pressure was 2e-6 |
|
37
|
Mon Jul 11 15:21:12 2016 |
Gabriele | General | Daily Progress | One disk installed into the chamber | [Alena, Gabriele]
We attached one of the silicon
lenses to a 1" optical post using some |
    |
36
|
Mon Jul 11 14:56:45 2016 |
Alena | Facility | Daily Progress | Vacuum chamber tests | Installed a gate valve between the roughing
and tubbo pump. See below a pump down curve.
The convection gauge is not calibrated. the |
|
35
|
Mon Jul 11 08:49:25 2016 |
Gabriele | Electronics | Configuration | Cymac RTS configuration | I copy here parts of an email from Jamie
with instructions on how to run the RTS on
the cymac: |
|
34
|
Fri Jul 8 16:49:11 2016 |
Gabriele | Electronics | Configuration | CyMAC | In the last days Jamie installed the patched
kernel to run the real time system (RTS)
on the new CyMAC. Today (with Jamie's |
|
33
|
Fri Jul 8 15:26:37 2016 |
Alena | Facility | Daily Progress | Vacuum chamber tests | Fixed the 307 gauge controller (a missing
contact on the rair panel). The low pressure
gauge was connected to 1G port and has measured |
 |
31
|
Thu Jul 7 17:44:11 2016 |
Gabriele | Facility | Daily Progress | Vacuum chamber tests | [Alena, Gabriele]
This afternoon we opened the tall
belljar vacuum chamber, and took everything |
    |