ID |
Date |
Author |
Type |
Category |
Subject |
455
|
Tue Jan 30 15:05:34 2018 |
Gabriele | General | Measurements | S1800515 S1800516 S1800517 S1800518 |
2018-01-30
50 mm fused silica disks from University Wafer
- 2:50pm in chamber
- S1800515 in CR1
- S1800516 in CR2
- S1800517 in CR3
- S1800518 in CR4
- 2:55pm roughing pump on
- 3:03pm turbo pump on
- Excitations:
- Quiet time before excitation: 1201400855
Excitation broadband: 1201400890
Quiet time after excitation: 1201400915
- Quiet time before excitation: 1201404545
Excitation broadband: 1201404580
Quiet time after excitation: 1201404605
- Quiet time before excitation: 1201408236
Excitation broadband: 1201408271
Quiet time after excitation: 1201408296
- Quiet time before excitation: 1201411926
Excitation broadband: 1201411961
Quiet time after excitation: 1201411986
- Quiet time before excitation: 1201415616
Excitation broadband: 1201415651
Quiet time after excitation: 1201415676
- Quiet time before excitation: 1201419306
Excitation broadband: 1201419341
Quiet time after excitation: 1201419366
- Quiet time before excitation: 1201422996
Excitation broadband: 1201423031
Quiet time after excitation: 1201423056
- Quiet time before excitation: 1201426686
Excitation broadband: 1201426721
Quiet time after excitation: 1201426746
|
595
|
Thu Nov 29 16:16:24 2018 |
Gabriele | General | Measurements | S1800515 S1800516 S1800519 S1800520 |
2018-11-29
- In chamber
- S1800515 in CR1
- S1800516 in CR2
- S1800519 in CR3
- S1800520 in CR4
- roughing pump on 4:14pm
- turbo pump on 4:24pm >> actually forgot to switch one turbo pump!!!
- turbo pump on 2018-11-30 at 9:27am
|
490
|
Sat Mar 24 17:13:49 2018 |
Gabriele | General | Measurements | S1800515 S1800519 |
2018-03-24
- 5:10pm in chamber
- S1800515 in CR1
- S1800519 in CR2
- 5:13pm roughing pump on
- 5:20pm turbo pump on
|
830
|
Fri Jan 24 15:16:23 2020 |
Gabriele | General | Measurements | S1800515 S1800519 |
2020-01-24
- 3:15pm in chamber
- S1800515 in CR1
- S1800519 in CR2
- 3:16pm roughing pump on
- 3:26pm turbo pump on
|
842
|
Mon Mar 9 08:47:15 2020 |
Gabriele | General | Measurements | S1800515 S1800519 |
2020-01-30
- 8:45 am in chamber
- S1800515 in CR1
- S1800519 in CR2
- 8:46 am roughing pump on
- 8:55 am turbo pump on
|
523
|
Tue May 1 16:25:47 2018 |
Alena | General | Measurements | S1800516 |
2018-05-01
- 16:10 pm in chamber
- 16:20 pm roughing pump on
- 16:40 pm turbo pump on
|
526
|
Fri May 4 13:54:55 2018 |
Alena | General | Measurements | S1800516 AK_01 AK_03 |
2018-05-04
- 02:21 pm in chamber:
- AK_01 in CR1
- AK_03 in CR3
- 02:25 pm roughing pump on
- 02:44 pm turbo pump on
- 03:30 pm in chamber:
- 03: 35 pm roughing pump on
- 03:42 turbo pump on
|
478
|
Tue Mar 6 16:01:47 2018 |
Gabriele | General | Measurements | S1800516 S1800520 a-Si 2" |
2018-03-06
2 inches fused silica disks with a-Si coating
- 4:00pm in chamber
- S1800516 in CR1
- S1600520 in CR2
- 4:02pm roughing pump on
- 4:10pm turbo pump on
|
468
|
Wed Feb 28 14:10:00 2018 |
Gabriele | General | Measurements | S1800519 S1800515 a-Si 2" |
2018-02-28
2 inches fused silica disks with a-Si coating
- 2:10pm in chamber (not reverse order)
- S1800519 in CR1
- S1800515 in CR2
- 2:12pm roughing pump on
- 2:22pm turbo pump on
- Excitations
- Quiet time before excitation: 1203905757
Excitation broadband: 1203905792
Quiet time after excitation: 1203905817
- Quiet time before excitation: 1203909447
Excitation broadband: 1203909482
Quiet time after excitation: 1203909507
- Quiet time before excitation: 1203913137
Excitation broadband: 1203913172
Quiet time after excitation: 1203913197
- Quiet time before excitation: 1203916827
Excitation broadband: 1203916862
Quiet time after excitation: 1203916887
- Quiet time before excitation: 1203920517
Excitation broadband: 1203920552
Quiet time after excitation: 1203920577
- Quiet time before excitation: 1203924207
Excitation broadband: 1203924242
Quiet time after excitation: 1203924267
- Quiet time before excitation: 1203927897
Excitation broadband: 1203927932
Quiet time after excitation: 1203927957
- Quiet time before excitation: 1203931587
Excitation broadband: 1203931622
Quiet time after excitation: 1203931647
|
457
|
Wed Jan 31 12:38:13 2018 |
Gabriele | General | Measurements | S1800519 S1800520 S1800521 S1800522 |
2018-01-31
50 mm fused silica disks from University Wafer
- 12:35pm in chamber
- S1800519 in CR1
- S1800520 in CR2
- S1800521 in CR3
- S1800522 in CR4
- 12:38pm roughing pump on
- 12:47pm turbo pump on
- Excitations
- Quiet time before excitation: 1201477474
Excitation broadband: 1201477509
Quiet time after excitation: 1201477534
- Quiet time before excitation: 1201481164
Excitation broadband: 1201481199
Quiet time after excitation: 1201481224
- Quiet time before excitation: 1201484854
Excitation broadband: 1201484889
Quiet time after excitation: 1201484914
- Quiet time before excitation: 1201488544
Excitation broadband: 1201488579
Quiet time after excitation: 1201488604
- Quiet time before excitation: 1201492234
Excitation broadband: 1201492270
Quiet time after excitation: 1201492294
- Quiet time before excitation: 1201495924
Excitation broadband: 1201495959
Quiet time after excitation: 1201495984
- Quiet time before excitation: 1201499614
Excitation broadband: 1201499649
Quiet time after excitation: 1201499674
- Quiet time before excitation: 1201503304
Excitation broadband: 1201503339
Quiet time after excitation: 1201503364
|
524
|
Wed May 2 10:08:20 2018 |
Alena | General | Measurements | S1800520 |
2018-05-02
- 10:05 am in chamber
- 10:06 am roughing pump on
- 10:20 am turbo pump on
|
525
|
Thu May 3 17:37:18 2018 |
Alena | General | Measurements | S1800520 |
2018-05-02
- 17:37 added ND because QPD was oversaturated. Repeating the measurement without venting
|
530
|
Mon May 14 13:42:42 2018 |
Alena | General | Measurements | S1800520 |
- 01:41 pm in chamber
- 01:41 pm roughing pump on
- 01:59 pm turbo pump on
|
549
|
Fri Jul 6 19:43:54 2018 |
Alena | General | Measurements | S1800614 S1800619 S1600600 |
- 19:30 in chamber
- S1800614 in CR1
- S1800618 in CR2
- S1600600 in CR4
- 19:40 roughing pump on
- 19:45 turbo pump on
Started a measurement for CR1 and CR2 only. CR4 is instaled, centered and ready to be measured later |
550
|
Tue Jul 10 13:50:32 2018 |
Gabriele | General | Measurements | S1800614 S1800619 S1600600 |
Measurement for S1600600 started at 11:50am
Quote: |
- 19:30 in chamber
- S1800614 in CR1
- S1800618 in CR2
- S1600600 in CR4
- 19:40 roughing pump on
- 19:45 turbo pump on
Started a measurement for CR1 and CR2 only. CR4 is instaled, centered and ready to be measured later
|
|
548
|
Fri Jun 29 10:52:00 2018 |
Alena | General | Measurements | S1800614 S1800618 S1800619 S1600600 |
- 11:01 in chamber
- S1800614 in CR1
- S1800618 in CR2
- S1800619 in CR3
- S1600600 in CR4
- 11:10 roughing pump on
- 11:20 turbo pump on
|
536
|
Fri Jun 1 17:46:19 2018 |
Alena | General | Measurements | S1800617 |
- 17:40 pm in chamber
- 17:45 roughing pump on
- 17:57 turbo pump on
|
537
|
Sat Jun 2 16:23:20 2018 |
Alena | General | Measurements | S1800618 |
- 16:20 in chamber
- 16:20 roughing pump on
- 16:30 turbo pump on
|
538
|
Sun Jun 3 14:45:51 2018 |
Alena | General | Measurements | S1800619 |
- 14:45 in chamber
- 14:45 roughing pump on
- 14:55 turbo pump on
|
539
|
Thu Jun 7 14:41:53 2018 |
Alena | General | Measurements | S1800620 |
- 14:41 in chamber
- 14:45 roughing pump on
- 14:54 turbo pump on
|
555
|
Thu Jul 26 15:35:48 2018 |
Alena | General | Measurements | S1800620 |
- 15:20 in chamber
- 15:30 roughing pump on
- 15:45 turbo pump on
|
512
|
Thu Apr 5 08:41:10 2018 |
Gabriele | General | Measurements | S1800634 |
2018-04-05
- 8:35am in chamber
- 8:39am roughing pump on
- 7:49pm turbo pump on
|
514
|
Sat Apr 7 09:15:56 2018 |
Gabriele | General | Measurements | S1800634 |
2018-04-07
- 9:10am in chamber
- 9:15am roughing pump on
- 9:25am turbo pump on
|
515
|
Mon Apr 9 15:34:57 2018 |
Alena | General | Measurements | S1800634 |
2018-04-09
- 3:30 pm in chamber
- 3:30 pm roughing pump on
- 3:45 pm turbo pump on
|
516
|
Thu Apr 12 08:36:16 2018 |
Gabriele | General | Measurements | S1800634 |
2018-04-12
- 8:30 am in chamber
- 8:35 am roughing pump on
- 8:45 pm turbo pump on
|
520
|
Sat Apr 14 18:31:25 2018 |
Gabriele | General | Measurements | S1800634 |
2018-04-14
- 6:40pm in chamber CR0
- 6:45pm roughing pump on
- 6:59pm turbo pump on
|
597
|
Fri Dec 7 09:27:26 2018 |
Gabriele | General | Measurements | S1800634 Zirconia |
2018-12-07
- in chamber
- 9:26am roughing pump on
- 9:36am turbo pump on
|
599
|
Thu Dec 13 12:43:06 2018 |
Gabriele | General | Measurements | S1812071 |
2018-12-13
- S1812071 in chamber CR0
- roughing pump on at 12:42pm
- turbo pump on at 1:07pm
|
603
|
Thu Dec 20 16:53:15 2018 |
Gabriele | General | Measurements | S1812071 |
2018-12-20
- in chamber
- 4:52pm roughing pump on
- 5:18pm turbo pump on
|
596
|
Fri Nov 30 15:54:04 2018 |
Gabriele | General | Measurements | S1812071 S1812072 |
2018-11-30
- in chamber
- S1812071 in CR1
- S1812072 in CR2
- roughing pump on 3:58pm
- turbo pump on 4:07pm
|
616
|
Wed Jan 30 10:00:34 2019 |
Gabriele | General | Measurements | S1812072 |
2019-01-30
- 9:58am in chamber
- 10:00am roughing pump on
- 10:25am turbo pump on
|
620
|
Tue Feb 12 08:23:00 2019 |
Alena | General | Measurements | S1900046, S1900047, S1900048, S1900049 |
2019-02-12
- 08:45 am in chamber
- S1900046 in CR1
- S1900047 in CR2
- S1900048 in CR3
- S1900049 in CR4
- 08:57am roughing pump on
- 09:10am turbo pump on
|
651
|
Thu Apr 4 10:24:55 2019 |
Gabriele | General | Measurements | S1900046, S1900047, S1900048, S1900049 |
2019-04-04
- 10:24 am in chamber
- S1900046 in CR1
- S1900047 in CR2
- S1900048 in CR3
- S1900049 in CR4
- 10:26am roughing pump on
- 10:35am turbo pump on
|
625
|
Wed Feb 20 09:08:57 2019 |
Gabriele | General | Measurements | S1900046, S1900047, S1900048, S1900049 |
2019-02-12
- 09:05 am in chamber
- S1900046 in CR1
- S1900047 in CR2
- S1900048 in CR3
- S1900049 in CR4
- 09:07am roughing pump on
- 09:15am turbo pump on
|
640
|
Wed Mar 20 13:10:01 2019 |
Alena | General | Measurements | S1900071 S1900072 |
2019-03-20
- 1:20 pm in chamber
- S1900071 in CR1
- S1900072 in CR2
- 1:36 pm roughing pump on
- 1:47 pm turbo pump on
|
637
|
Mon Mar 11 16:24:02 2019 |
Gabriele | General | Measurements | S1900072 S1900071 |
2019-03-11
- 4:23pm in chamber
- S1900072 in CR1
- S1900071 in CR2
- 4:25pm roughing pump on
- 4:35pm turbo pump on
|
643
|
Mon Mar 25 08:27:19 2019 |
Gabriele | General | Measurements | S1900195 |
2019-03-25
- 8:20am in chamber CR0
- 8:22am roughing pump on
- 8:50am turbo pump on
|
647
|
Fri Mar 29 16:26:22 2019 |
Gabriele | General | Measurements | S1900195 |
2019-03-29
- 4:20pm in chamber CR0
- 4:23pm roughing pump on
- 4:45pm turbo pump on
|
655
|
Tue Apr 9 09:19:39 2019 |
Gabriele | General | Measurements | S1900198 S1900199 S1900200 S1900201 |
2019-04-09
- 9:18 am in chamber
- S1900198 in CR1
- S1900199 in CR2
- S1900200 in CR3
- S1900201 in CR4
- 9:19am roughing pump on
- 9:27am turbo pump on
|
825
|
Mon Jan 13 12:40:56 2020 |
Gabriele | General | Measurements | S2000085 S2000086 S2000087 S2000088 |
2020-01-13
- 12:40pm in chamber
- S2000085 in CR1
- S2000086 in CR2
- S2000087 in CR3
- S2000088 in CR4
- 12:41pm roughing pump on
- 12:51pm turbo pump on
|
826
|
Tue Jan 14 10:10:25 2020 |
Seth Linker | General | Measurements | S2000089, S2000090, S2000091, S2000092 |
2020-01-14
- 10:10 am in chamber
- S2000089 in CR1
- S2000090 in CR2
- S2000091 in CR3
- S2000092 in CR4
- 10:16 am roughing pump on
- 10:26 am turbo pump on
|
828
|
Fri Jan 17 09:16:45 2020 |
Seth Linker | General | Measurements | S2000093, S2000094 |
2020-01-17
- 9:16 am in chamber
- S2000093 in CR1
- S2000094 in CR2
- 9:17 am roughing pump on
- 9:26 am turbo pump on
|
419
|
Fri Aug 18 14:15:47 2017 |
Zach | Electronics | Modeling | Same Voltage ESD Sweep |
2017-08-18
- I ran a sweep of the central position in the two ESD setup with both set at the same voltage. There were two designs that maximized excitation by different metrics, the design with a 3 mm shift from the original design maximized excitation overall, but the 20 kHz mode was worse by a bout a factor of 5. The design with a -2 mm shift maximized the high frequency modes, particularly the modes most affected by the shift.
- MATLAB crashed shortly after the sweep so I will have to recreate the RMS plots of the dynamic modes later.
  
|
Attachment 1: two_positive_ratio_sweep.pdf
|
|
Attachment 2: -2mm_two_positive.jpg
|
|
135
|
Tue Oct 18 16:52:16 2016 |
Gabriele | General | Measurements | Sample inspections from annealing run 10/10/2016 |
LIGO-T1600466
- S1600432 shows some residual on face, close to the edge, probably from first contact
- S1600433 looks ok
- S1600434 shows a small residual on the face, the edge, probably from first contact, and a back spot, probably a residual of the contamination
- S1600435 shows a large halo on the face, like what you get when solvents dry on the surface leaving some traces
- S1600436 has some red residual on the edge, likely first contact
- S1600437 the surface looks ok but the edge has a clear reddish color
|
139
|
Thu Oct 20 11:04:03 2016 |
Gabriele | General | Measurements | Sample with flame polished edges |
Sample with edges flame polished in Glasgow
Installation
- into the chamber and balanced at 11am. Pump down started at 11:00am.
- it looks like the turbo pump shaked the sample too much and moved it significantly. At 11:44am I had to tweak a bit the input steering periscope to avoid the outgoing beam to be clipped on the pickoff mirror
- roughing pump off at 2:27pm
- excitation at 2:36pm (2000 V, 30 s)

Results
 
 
% Freq First Q of pair Second Q of pair
1117.4 2.3392e+07 2.3392e+07
2555.9 1.8650e+07 1.8650e+07
4441.1 1.3003e+07 1.3003e+07
6759.2 1.6003e+07 1.5656e+07
6781.8 1.4795e+07 1.4795e+07
9499.2 5.6765e+06 5.6765e+06
10219.5 1.3148e+07 2.7060e+06
10222.3 1.3909e+07 4.2609e+04
11444.0 2.0756e+06 6.5364e+05
12649.4 1.0264e+07 8.7228e+06
12650.7 8.6808e+06 8.6808e+06
14176.3 1.0290e+07 1.0290e+07
14177.5 1.0185e+07 1.0185e+07
16113.7 1.0856e+07 9.7535e+06
16202.5 8.6733e+06 5.0176e+06
18619.0 1.3113e+07 1.3113e+07
18622.1 1.4864e+07 1.4864e+07
20149.0 1.4047e+06 1.4047e+06
21348.8 6.9944e+06 6.9944e+06
21353.3 8.0679e+06 3.1734e+05
23529.5 1.3076e+07 1.3076e+07
24482.3 9.6841e+06 9.6841e+06
24669.1 4.8629e+06 4.8629e+06
24670.5 6.3609e+06 6.3609e+06
25499.2 5.2216e+06 5.2216e+06
25828.0 3.3780e+06 3.3780e+06
27101.0 1.4934e+07 1.4934e+07
27103.5 1.4956e+07 1.4956e+07
28883.5 1.2076e+07 1.2076e+07
29068.6 1.1494e+07 1.1494e+07
29072.0 9.7555e+06 9.7555e+06
29190.0 5.9610e+06 5.9610e+06
29193.2 7.9280e+06 7.9280e+06
29502.2 7.8254e+06 7.8254e+06
30867.0 6.3681e+06 6.3681e+06
31267.0 1.6836e+06 1.4541e+05
32194.4 5.3275e+06 5.3275e+06
32200.0 5.9215e+06 2.6587e+06
The following plot compares the Q measured on this sample yesterday here at Caltech with the GeNS system, with the measurement perfomed by Raymond Robie in Glasgow.
- blue dots: measurements on the flame polished sample here at Caltech
- orange crosses and yellow triangles: Raymond’s measurements on the flame polished sample at in Glasgow (after annealing)
- purple crosses: typical Q values measured on disk samples (not annealed nor flame polished) here at Caltech
Flame polishing of the edges did not change significantly the Q we measure with the GeNS system. However, the GeNS system rovide systematically higher Q values for basically all measurable modes.

|
Attachment 7: ringdown_raw_data_2016_10_20.m
|
%% Parameters
prefix = '2016_10_20'; % name of the folder where result will be saved
gps0 = 1161034552; % GPS time of clean data before excitation
gps1 = 1161034619; % GPS time right after excitation
dt = 30; % how much data to be used to search peaks
minsnr = 6; % minimum peak SNR
minfr = 1000; % minimum peak frequency
Dt = 3600; % total amount of time for the ringdown measurement
... 303 more lines ...
|
256
|
Fri Jan 6 12:19:22 2017 |
Alena, Bob, Stephen and Calum | General | Daily Progress | Second vacuum chamber |
Cleaning and baking (200 C air foe SS and 120 for Al) parts for the new vacuum chamber

|
120
|
Wed Sep 21 14:42:47 2016 |
Gabriele | General | General | Serialized (etched) disk installed |
Just for fun, I installed the disk thas has been etched in the center with "1234". I figured out that the ESD PCB was probably too close to the disk, so I moved it a bit up.
Pump down started at about 2:38pm LT. |
454
|
Tue Jan 30 09:19:09 2018 |
Gabriele | Optics | Configuration | Setup for 50mm disks |
I realigned all optical levers to measure the 50mm disks. In brief, I moved the input 2" mirrors, the in-vacuum 2" mirrors and the PZT mirrors so that the beam hits the 50mm sample and gets back into the QPD. Re-aligned everything to the horizontal reference using water. |
459
|
Tue Feb 13 16:28:49 2018 |
Gabriele | Optics | Configuration | Setup resigned for 75mm disks |
|
373
|
Fri Jul 21 14:55:02 2017 |
Gabriele | General | Measurements | Shear and bulk losses in annealed tantala |
I repeated the analysis for bulk and shear losses described in an early elog entry, with the same coating, but after annealing at 500C for 9 hours.
The COMSOL model is the same as before, so the dilution factors are the same, except that this time I could measure a few more modes at high frequency:

As in the previous analysis, I fitted four different models:
1) one single loss angle for both bulk and shear, constant in frequency
2) one single loss angle for both bulk and shear, linear in frequency
3) separate bulk and shear loss angles, constant
4) separate bulk and shear loss angles, linear in frequency
The data strongly favor the last model: two loss angles for shear and bulk, linearly dependent on frequency (Bayes factor -22.7 for the second best model, which is the frequency dependent single loss angle).
The results are below.
Single constant loss angle


Single loss angle, linearly dependent on frequency

 
Bulk and shear loss angles, constant


Bulk and shear loss angles, linearly dependent on frequency

 
|
Attachment 7: postannealing_linear_bulk_shear.png
|
|