    Reply  Sun May 22 23:40:45 2016, Gabriele, Optics, Design, Optical levers layout crime_v1.pdf
Entry  Thu Jun 16 00:47:42 2016, Gabriele, Optics, Daily Progress, Quality factor measurement of a Mark Optics disk at LMA q_factors.pngloss_angle.png2016-06-13_09.50.11.jpg
Entry  Mon Jul 18 18:05:46 2016, Gabriele, Optics, Daily Progress, Optical setup 2016-07-18_14.33.35.jpg
Entry  Mon Jul 25 15:35:31 2016, Gabriele, Optics, Characterization, Calibration of the QPD in physical units crime_beam.PNGcrime_beam.PNGcrime_beam.PNGcalibrated_disk.png
Entry  Fri Aug 19 19:05:01 2016, Gabriele, Optics, Daily Progress, Disk installed into the chamber 10x
Entry  Sun Aug 21 13:45:56 2016, Gabriele, Optics, Daily Progress, Wierd behavior of ring downs and Improved setup second_ring_downs.pngthird_ring_downs.png2016-08-21_08.46.11.jpg2016-08-21_13.29.24.jpg2016-08-21_13.29.32.jpg
Entry  Mon Aug 22 16:59:13 2016, Gabriele, Alastair, Optics, Daily Progress, Laser polishing of the disk edges 2016-08-22_14.47.47.jpg2016-08-22_13.52.02.jpg
Entry  Thu Sep 1 02:13:33 2016, Gabriele, Optics, Characterization, Expected frequencies for the 75 mm disks with flats allmodes_aggregated.pdf
Entry  Tue Sep 20 15:34:00 2016, Gabriele, Optics, Daily Progress, Improved optical lever layout beam_profile.png2016-09-19_11.33.48.jpg2016-09-20_15.50.21.jpglayoutpng.png
Entry  Thu Sep 22 13:39:40 2016, Gabriele, Optics, Configuration, Updated design for the new C.Ri.Me. setup crime_v2.pdf
Entry  Mon Sep 26 15:59:09 2016, Gabriele, Optics, Daily Progress, QPD auto centering 2016-09-26_15.44.02.jpg2016-09-26_15.43.45.jpgautocenter.png
Entry  Thu Sep 29 15:40:45 2016, Gabriele, Optics, Design, Beam profile of new 21mW HeNe laser and tweak of optical lever design beam_profile_all.png
Entry  Fri Jan 20 17:20:20 2017, Gabriele, Optics, Daily Progress, Input part of the optical lever setup installed and aligned optical_setup.png
    Reply  Mon Jan 23 16:29:52 2017, Gabriele, Optics, Daily Progress, Input part of the optical lever setup installed and aligned 
Entry  Fri Jan 27 14:56:55 2017, Gabriele, Optics, Daily Progress, Optical lever setup completed photo_setup.pngphoto_chamber.png
Entry  Wed Feb 1 15:23:42 2017, Gabriele, Optics, Noise hunting, Wandering line is due to the laser laser_noise_rin.pngUntitled.avi
Entry  Mon Feb 6 11:19:13 2017, Gabriele, Optics, Daily Progress, Laser swap 
Entry  Tue Feb 7 16:16:37 2017, Gabriele, Optics, Daily Progress, Lasers crime_v3.pdf
Entry  Wed Feb 8 17:01:01 2017, Gabriele, Optics, Daily Progress, Two laser installed, setup aligned photo_setup_new.png
    Reply  Thu Feb 9 09:30:52 2017, Gabriele, Optics, Daily Progress, Two laser installed, setup aligned Screenshot.png
Entry  Thu Feb 9 11:35:27 2017, Gabriele, Optics, Configuration, QPD calibration  11x
Entry  Fri Feb 17 13:44:47 2017, Gabriele, Optics, Daily Progress, Swapped picomotor and re-alignment 
Entry  Fri Mar 10 16:44:13 2017, Gabriele, Optics, Daily Progress, Updated in vacuum periscope of CR0 
Entry  Thu Mar 30 15:23:44 2017, Gabriele, Optics, General, Swapped HeNe laser in CR0 
Entry  Fri Apr 7 16:19:03 2017, Gabriele, Optics, Daily Progress, New 1103P laser installed 
Entry  Tue Jan 30 09:19:09 2018, Gabriele, Optics, Configuration, Setup for 50mm disks 
Entry  Tue Feb 13 16:28:49 2018, Gabriele, Optics, Configuration, Setup resigned for 75mm disks 
Entry  Thu Mar 8 09:40:10 2018, Gabriele, Optics, Configuration, Realigned all optical levers to horizontal reference 
Entry  Tue Mar 27 16:36:49 2018, Gabriele, Optics, Configuration, Optical levers re-aligned for 50mm substrates 
Entry  Fri Apr 12 09:36:54 2019, Gabriele, Optics, Configuration, Realignment 