40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
Coating Ring-down Measurement Lab elog, Page 18 of 18
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
880 Entries
Goto page
Previous
1
,
2
,
3
...
16
,
17
, 18
Sun May 22 23:40:45 2016, Gabriele, Optics, Design, Optical levers layout
Thu Jun 16 00:47:42 2016, Gabriele, Optics, Daily Progress, Quality factor measurement of a Mark Optics disk at LMA
Mon Jul 18 18:05:46 2016, Gabriele, Optics, Daily Progress, Optical setup
Mon Jul 25 15:35:31 2016, Gabriele, Optics, Characterization, Calibration of the QPD in physical units
Fri Aug 19 19:05:01 2016, Gabriele, Optics, Daily Progress, Disk installed into the chamber
10x
Sun Aug 21 13:45:56 2016, Gabriele, Optics, Daily Progress, Wierd behavior of ring downs and Improved setup
Mon Aug 22 16:59:13 2016, Gabriele, Alastair, Optics, Daily Progress, Laser polishing of the disk edges
Thu Sep 1 02:13:33 2016, Gabriele, Optics, Characterization, Expected frequencies for the 75 mm disks with flats
Tue Sep 20 15:34:00 2016, Gabriele, Optics, Daily Progress, Improved optical lever layout
Thu Sep 22 13:39:40 2016, Gabriele, Optics, Configuration, Updated design for the new C.Ri.Me. setup
Mon Sep 26 15:59:09 2016, Gabriele, Optics, Daily Progress, QPD auto centering
Thu Sep 29 15:40:45 2016, Gabriele, Optics, Design, Beam profile of new 21mW HeNe laser and tweak of optical lever design
Fri Jan 20 17:20:20 2017, Gabriele, Optics, Daily Progress, Input part of the optical lever setup installed and aligned
Mon Jan 23 16:29:52 2017, Gabriele, Optics, Daily Progress, Input part of the optical lever setup installed and aligned
Fri Jan 27 14:56:55 2017, Gabriele, Optics, Daily Progress, Optical lever setup completed
Wed Feb 1 15:23:42 2017, Gabriele, Optics, Noise hunting, Wandering line is due to the laser
Mon Feb 6 11:19:13 2017, Gabriele, Optics, Daily Progress, Laser swap
Tue Feb 7 16:16:37 2017, Gabriele, Optics, Daily Progress, Lasers
Wed Feb 8 17:01:01 2017, Gabriele, Optics, Daily Progress, Two laser installed, setup aligned
Thu Feb 9 09:30:52 2017, Gabriele, Optics, Daily Progress, Two laser installed, setup aligned
Thu Feb 9 11:35:27 2017, Gabriele, Optics, Configuration, QPD calibration
11x
Fri Feb 17 13:44:47 2017, Gabriele, Optics, Daily Progress, Swapped picomotor and re-alignment
Fri Mar 10 16:44:13 2017, Gabriele, Optics, Daily Progress, Updated in vacuum periscope of CR0
Thu Mar 30 15:23:44 2017, Gabriele, Optics, General, Swapped HeNe laser in CR0
Fri Apr 7 16:19:03 2017, Gabriele, Optics, Daily Progress, New 1103P laser installed
Tue Jan 30 09:19:09 2018, Gabriele, Optics, Configuration, Setup for 50mm disks
Tue Feb 13 16:28:49 2018, Gabriele, Optics, Configuration, Setup resigned for 75mm disks
Thu Mar 8 09:40:10 2018, Gabriele, Optics, Configuration, Realigned all optical levers to horizontal reference
Tue Mar 27 16:36:49 2018, Gabriele, Optics, Configuration, Optical levers re-aligned for 50mm substrates
Fri Apr 12 09:36:54 2019, Gabriele, Optics, Configuration, Realignment
Goto page
Previous
1
,
2
,
3
...
16
,
17
, 18
ELOG V3.1.3-