Message ID: 91     Entry time: Fri Aug 19 19:05:01 2016
Author: Gabriele 
Type: Optics 
Category: Daily Progress 
Subject: Disk installed into the chamber 

I assembled the disk suspension sytem and installed into the chamber. Although I don't have the magnets and coils, I installed the movable retaining disk, and used it to center the disk.

I first aligned the input laser using the reflection off the black glass, which turns out to be quite bright and very well visible. Tomorrow I'm going to measure how much power we have in the black glass.

The reflection from the disk is slighlty separated from the reflection from the black glass, so I can block it using an iris.

At 6:50pm I closed the chamber and started the roughing pump. At 7:05pm pressure was below 1 Tor so I started the turbo pump. When leaving pressure is about 1.6e-5 Tor.