40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 89     Entry time: Thu Aug 18 18:15:18 2016
Author: Gabriele, Alena 
Type: Clean 
Category: Daily Progress 
Subject: Clean room construction progress 

Ceiling, back and side panels are installed. The air filters have been cabled and connected to the power supply.

ELOG V3.1.3-