Message ID: 88     Entry time: Wed Aug 17 16:41:05 2016
Author: Gabriele, Alena 
Type: Clean 
Category: Daily Progress 
Subject: Clean room construction progress 

The clean room frame is built and secured to the floor and wall. Panels are being installed on the ceiling and back. Also, the optical table has been leveled.