40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 8     Entry time: Fri Oct 12 16:23:20 2012
Author: janosch 
Type: Optics 
Category: Daily Progress 
Subject: reassembled setup 

Nothing has happened since Steve, the visiting highschool teacher, has left. Meanwhile, some parts of the multi-color BRDF setup were delivered. I assembled everything today and realigned the lasers. Everything is ready now for a three-color BRDF measurement (the previous Richter record was 2 colors). I will claim back my video capture device as soon as possible from my neighbors and then take new images.

ELOG V3.1.3-