40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 49     Entry time: Mon Jul 18 17:46:04 2016
Author: Gabriele 
Type: General 
Category: Daily Progress 
Subject: First look at QPD signals 

Here's the first spectrum of the QPD X and Y signals, acquired with the digital system. Roughing and turbo pumps are still on.

The noise floor seems quite non stationary. To be investigated.

ELOG V3.1.3-