Message ID: 46
Entry time: Mon Jul 18 13:39:45 2016
In reply to: 45
|
Author: |
Gabriele |
Type: |
Facility |
Category: |
Daily Progress |
Subject: |
Pump down started |
|
|
Today at 1:40pm pressure is 8.5e-7 Torr
Quote: |
Following Alena's procedure, at about 1:30pm LT I started the chamber pump down. At 14:15pm LT the pressure was still 240 mTorr
At 6:20pm the pressure was about 70 mTorr, so I started the turbo pump.
|
|