40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Entry  Sat Jul 16 14:15:44 2016, Gabriele, Facility, Daily Progress, Pump down started 
    Reply  Mon Jul 18 13:39:45 2016, Gabriele, Facility, Daily Progress, Pump down started 
Message ID: 46     Entry time: Mon Jul 18 13:39:45 2016     In reply to: 45
Author: Gabriele 
Type: Facility 
Category: Daily Progress 
Subject: Pump down started 

Today at 1:40pm pressure is 8.5e-7 Torr

Quote:

Following Alena's procedure, at about 1:30pm LT I started the chamber pump down. At 14:15pm LT the pressure was still 240 mTorr

At 6:20pm the pressure was about 70 mTorr, so I started the turbo pump.

 

ELOG V3.1.3-