At 5pm the pressure was 6.5e-6 torr.

Checked again at:

  • 9am, pressure was 2e-6 torr
  • 11:30am, pressure was 1.5e-6 torr
  • 5pm, pressure was 1.4e-6 torr
Quote:

Installed a gate valve between the roughing and tubbo pump. See below a pump down curve. The convection gauge is not calibrated. the turbo started at 14th min (at about 3 torr)

 