40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 320     Entry time: Mon Feb 27 08:42:05 2017
Author: Gabriele 
Type: General 
Category: Measurements 
Subject: S1600453 S1600490 

2017-02-27

  • 8:40am, in chamber, balanced
    • S1600453 in CR1
    • S1600491 in CR2 (i meant to install 490, but got confused)
  • 10:23am, roughing pump on, clamps on
  • 10:32am, turbo pump on
  • 3:01pm, something is wrong with CR1 (the 666 Hz line due to the turbo pump is very large and saturates the QPD signals). Venting
  • 4:11pm in chamber
    • S1600453 in CR1
    • S1600490 in CR2
  • 4:12pm roughing pump on, clamps on
  • 4:20pm turbo pump on
  • Excitations
    • Quiet time before excitation: 1172290836
      Excitation broadband: 1172290871
      Quiet time after excitation: 1172290936

    • Quiet time before excitation: 1172292766
      Excitation broadband: 1172292801
      Quiet time after excitation: 1172292866

    • Quiet time before excitation: 1172294696
      Excitation broadband: 1172294731
      Quiet time after excitation: 1172294796

    • Quiet time before excitation: 1172296626
      Excitation broadband: 1172296661
      Quiet time after excitation: 1172296726

    • Quiet time before excitation: 1172298556
      Excitation broadband: 1172298591
      Quiet time after excitation: 1172298656

    • Quiet time before excitation: 1172300486
      Excitation broadband: 1172300522
      Quiet time after excitation: 1172300587

    • Quiet time before excitation: 1172302417
      Excitation broadband: 1172302452
      Quiet time after excitation: 1172302518

    • Quiet time before excitation: 1172304348
      Excitation broadband: 1172304383
      Quiet time after excitation: 1172304448

2017-02-28

  • 11:08am, vented
ELOG V3.1.3-