40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 313     Entry time: Sun Feb 19 11:46:26 2017
Author: Gabriele 
Type: General 
Category: Measurements 
Subject: S1600458 S1600474 S1600491 

2017-02-19

  • 11:28am an chamber:
    • S1600458 in CR1
    • S1600474 in CR2
    • S1600491 in CR3
    • empty CR4
  • 11:46am roughing pump on, clamps on
  • 11:57am turbo pump on
  • Excitations:
    • Quiet time before excitation: 1171579753
      Excitation (broad band) at 1171579788 (60 s)
      Quiet time after excitation: 1171579854

    • Quiet time before excitation: 1171581684
      Excitation (broad band) at 1171581719 (60 s)
      Quiet time after excitation: 1171581784

    • Quiet time before excitation: 1171583614
      Excitation (broad band) at 1171583649 (60 s)
      Quiet time after excitation: 1171583714

    • Quiet time before excitation: 1171585545
      Excitation (broad band) at 1171585580 (60 s)
      Quiet time after excitation: 1171585645

    • Quiet time before excitation: 1171587475
      Excitation (broad band) at 1171587510 (60 s)
      Quiet time after excitation: 1171587575

    • Quiet time before excitation: 1171589405
      Excitation (broad band) at 1171589440 (60 s)
      Quiet time after excitation: 1171589505

    • Quiet time before excitation: 1171591335
      Excitation (broad band) at 1171591370 (60 s)
      Quiet time after excitation: 1171591435

    • Quiet time before excitation: 1171593265
      Excitation (broad band) at 1171593300 (60 s)
      Quiet time after excitation: 1171593365

2017-02-21

  • 10:30am, gate valve closed, pumps stopped, venting
ELOG V3.1.3-