  • assembled the four in-vacuum periscopes (no mirrors yet)
  • soldered kapton wires to the four ESD board; the vacuum side HV connectors are installed
  • installed the picomotor into the traslation stage, and soldered the two picomotor wires to a twisted kapton pair. Note: the white wire is connected to the kapton wire which is twisted on the other side.