40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
Coating Ring-down Measurement Lab elog |
Not logged in |
 |
|
|
Message ID: 272
Entry time: Mon Jan 23 16:29:52 2017
In reply to: 270
|
Author: |
Gabriele |
Type: |
Optics |
Category: |
Daily Progress |
Subject: |
Input part of the optical lever setup installed and aligned |
|
|
Today I cabled and installed the four QPD, in a temporary position. I also assembled four picomotor mounts that will be used for the auto-centering.
Quote: |
Today I installed and aligned part of the optical components for the optical lever of the new setup. For the moment being I installed only the input components, and aligned the beams into the vacuum chamber. Since I don't have any in-vacuum optics yet, there's nothing more that can be done now.
|
|