40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 267     Entry time: Thu Jan 19 14:27:02 2017
Author: Alena 
Type: General 
Category: Vacuum 
Subject: First vacuum test new chamber 

Turbo pump controller (new chamber) was configured. Need to reduce the frequency or setup a standby mode. First pump down: E-7 range reached within about an hour. See plot: blue - old crime chamber, pink - new crime chamber.

ELOG V3.1.3-