40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 265     Entry time: Thu Jan 19 12:49:17 2017
Author: Gabriele 
Type: Facility 
Category: Vacuum 
Subject: Skyhook installed 

The SkyHook has been put in place and bolted down to the floor.

Attachment 1: IMG_4241.JPG  2.129 MB  | Hide | Hide all
IMG_4241.JPG
Attachment 2: IMG_4241.JPG  2.129 MB  | Hide | Hide all
IMG_4241.JPG
Attachment 3: IMG_4241.JPG  483 kB  | Hide | Hide all
IMG_4241.JPG
ELOG V3.1.3-