40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  Coating Ring-down Measurement Lab elog  Not logged in ELOG logo
Message ID: 113     Entry time: Thu Sep 15 11:23:13 2016
Author: Gabriele 
Type: Facility 
Category: General 
Subject: Chamber open 

Turbo pump off and spinning down at 9:37am LT. Pumo completely stopped at 11:15am LT

Openend the chamber and removed the sample at ~11:20am LT

ELOG V3.1.3-