Fri May 21 12:12:11 2021, Paco, Update, NoiseBudget, AUX PDH loop identification
|
Fri May 21 00:15:33 2021, Koji, Update, Electronics, DC Power Strip delivered / stored 9x
| +
Thu May 20 16:56:21 2021, Koji, Update, Electronics, Production version of the HV coil driver tested with KEPCO HV supplies
| +
Wed May 19 18:29:41 2021, Koji, Update, SUS, Mass Properties of SOS Assembly with 3"->2" Optic sleeve, in SI units 
| +
Tue May 18 20:26:11 2021, rana, Update, PSL, HEPA speed raised
|
Sat May 15 12:39:54 2021, gautam, Update, PSL, NPRO tripped/switched off
|
Fri May 14 03:29:50 2021, Koji, Update, Electronics, HV Driver noise test with the new HV power supply from Matsusada
| +
Wed May 12 10:53:20 2021, Anchal, Paco, Update, LSC, PSL-IMC PDH Loop and XARM PDH Loop diagram
|
Mon May 10 10:57:54 2021, Anchal, Paco, Summary, Calibration, Using ALS beatnote for calibration, test  
|
Thu May 6 16:13:39 2021, Anchal, Summary, IMC, Angular actuation calibration for IMC mirrors
|
Wed May 5 13:05:07 2021, Chub, Update, General, chassis delivery from De Leone
| +
Mon May 3 23:28:56 2021, Koji, Summary, General, Weird gas leakagr kind of noise in 40m control room
| +
Wed Apr 28 11:31:40 2021, Jon, Update, VAC, Empty N2 Tanks
|
Mon Apr 26 18:52:52 2021, Anchal, Paco, HowTo, Computer Scripts / Programs, awg free slot
| +
Thu Apr 22 17:28:34 2021, Yehonathan, Update, PSL, Laser amplifier  
|
Thu Apr 22 14:49:08 2021, gautam, Update, Computer Scripts / Programs, rossa added to RTS authorized keys
|
Thu Apr 22 01:42:38 2021, Koji, Summary, Electronics, HV Supply Comparison   
| +
Wed Apr 21 13:10:12 2021, Koji, Update, General, PSL HEPA Maintenance
|
Wed Apr 21 10:59:07 2021, rana, Summary, Cameras, note on new GigE cam @ 1064
| +
Wed Apr 21 01:14:03 2021, Koji, Update, PSL, PSL Table (sort of) covered / HEPA "chimney"  
| +
Mon Apr 19 19:40:54 2021, Yehonathan, Update, General, Glue Freezer completely frozen
|
Fri Apr 16 11:31:00 2021, rana, Update, elog, elog stuck ~10 AM today
|
Thu Apr 15 18:33:39 2021, Koji, Update, CDS, More 16bit ADC adapter boards
| +
Thu Apr 15 15:54:46 2021, gautam, Update, IOO, Waveplate commissioning - hardware installed
|
Wed Apr 14 23:55:34 2021, gautam, Update, Electronics, HV Coil driver assembly
| +
Wed Apr 14 16:46:24 2021, Anchal, Update, General, IFO State
| +
Wed Apr 14 15:30:29 2021, rana, Update, General, Sorry, it was me
| +
Wed Apr 14 13:16:20 2021, Anchal, Configuration, Computers, 40m Control Room Changes
|
Tue Apr 13 19:24:45 2021, gautam, Update, PSL, High power operations 
| +
Mon Apr 12 18:34:26 2021, Yehonathan, Summary, PSL, PMC unlocked at 2pm on Sunday; ~ Restored
|
Thu Apr 8 20:58:17 2021, Koji, Update, CDS, ADC adapter boards assembly
|
Wed Apr 7 13:07:03 2021, Jordan, Update, SUS, CoM on 3"->2" Adapter Ring for SOS 
|
Wed Apr 7 02:50:49 2021, Koji, Update, SUS, Flange Inspections
| +
Tue Apr 6 21:17:04 2021, Koji, Summary, General, PSL HEPA investigation  
|
Mon Apr 5 22:26:01 2021, gautam, Update, LSC, PRMI 1f locking (no ETMs) recovered
|
Mon Apr 5 08:25:59 2021, Anchal, Paco, Update, General, Restore MC from early quakes
|
Sat Apr 3 00:42:40 2021, gautam, Update, LSC, PRFPMI locking with half input power 
|
Fri Apr 2 01:26:41 2021, gautam, Update, Electronics, REFL55 chain checkout again, seems fine
| +
Thu Apr 1 18:16:28 2021, Koji, Update, Electronics, Electronics Packaging for assembly work
|
Thu Apr 1 00:50:06 2021, gautam, Update, SUS, PRMdiag
| +
Wed Mar 31 03:56:37 2021, Koji, Summary, Electronics, A bunch of electronics received 
| +
Mon Mar 29 19:32:46 2021, gautam, Update, LSC, REFL55 whitening checkout
|
Thu Mar 25 18:05:04 2021, gautam, Update, Electronics, Stuffed HV coil drivers received from Screaming Circuits
|
Thu Mar 25 17:39:28 2021, gautam, Update, Computer Scripts / Programs, Spot position measurement scripts "modernized" 
| +
Thu Mar 25 16:02:15 2021, gautam, Summary, SUS, Repeated measurement of coil Rs & Ls for PRM/BS
| +
Thu Mar 25 14:58:16 2021, Yehonathan, Update, BHD, SOS SmCo magnets Inspection
|
Mon Mar 22 16:29:17 2021, gautam, Update, ASC, Some prep for AS WFS commissioning 
|
Sun Mar 21 19:31:29 2021, rana, Summary, Electronics, RTL-SDR for monitoring RF noise / interference
| +
Fri Mar 19 22:24:54 2021, gautam, Update, LSC, PRMI investigations: what IS the matrix??  
|
Fri Mar 19 15:31:56 2021, Aidan, Update, Computers, Activated MATLAB license on donatella
|
|