Wed Aug 10 13:52:23 2011, Manuel , Ishwita, Update, PEM, Moving Seismometers
|
Thu Aug 11 10:56:08 2011, Ishwita, Manuel, Update, PEM, Moving Seismometers
|
Thu Aug 11 08:29:28 2011, steve, Update, Computers, dataviewer at Rosalba
|
Thu Aug 11 06:45:14 2011, Nicole, Summary, SUS, Shaking Testing
|
Thu Aug 11 02:16:57 2011, Jenne, Update, Green Locking, Y-green aligned and flashing
|
Wed Aug 10 22:47:22 2011, rana, Summary, VAC, Vacuum Workstation (linux3) re-activated
|
Wed Aug 10 20:40:17 2011, Jenny, Update, PSL, PDH locking: got an error signal
|
Wed Aug 10 19:18:26 2011, Nicole, Summary, SUS, Fixed Reflective Photosensors; Recalibrated Photosensor 2
|
Wed Aug 10 18:25:45 2011, Jenne, Update, SUS, ETMY mini-update
|
Wed Aug 10 15:39:33 2011, jamie, Update, SUS, current SUS input diagonalization overview 7x
|
Wed Aug 10 11:22:55 2011, Suresh, Update, IOO, MC A2L alignment
|
Wed Aug 10 14:30:55 2011, kiwamu, Update, IOO, Re: MC A2L alignment
|
Wed Aug 10 12:33:34 2011, Manuel, Ishwita, Summary, PEM, Weekly summary
|
Wed Aug 10 12:32:09 2011, Nicole, Summary, SUS, Weekly Summary Update
|
Wed Aug 10 12:28:22 2011, Ishwita , Manuel, Update, PEM, AA board gain
|
Wed Aug 10 00:11:39 2011, jamie, Update, SUS, check of input diagnolization of ETMX after OSEM tweaking
|
Wed Aug 10 07:59:33 2011, steve, Update, SUS, this is too dam nice
|
Wed Aug 10 02:40:40 2011, Jenny, Update, PSL, Dither freq for PZT chosen: 2.418 MHz
|
Wed Aug 10 01:40:40 2011, Koji, Update, SUS, ETMY exploration
|
Wed Aug 10 02:29:38 2011, Jenne, Update, SUS, ETMY exploration
|
Tue Aug 9 19:53:56 2011, Nicole, Summary, SUS, Weekly Summary
|
Tue Aug 9 16:54:47 2011, steve, Update, VAC, scratch on vac door
|
Tue Aug 9 16:40:12 2011, steve, Update, General, clean room coat counts
|
Tue Aug 9 16:21:59 2011, Manuel, Ishwita, Update, WienerFiltering, First results of our simulations  
|
Tue Aug 9 16:00:58 2011, Jenny, Update, PSL, Amplitude response of PZT 
|
Tue Aug 9 10:15:25 2011, kiwamu, Update, General, in-vac work plan today
|
Tue Aug 9 15:14:46 2011, Koji, Update, General, in-vac work plan today
|
Tue Aug 9 13:34:40 2011, Nicole, Summary, SUS, New Calibration Plots for Photosensors 
|
Tue Aug 9 02:44:32 2011, Suresh, Update, SUS, ETMX free swinging data
|
Tue Aug 9 11:33:33 2011, kiwamu, Update, SUS, Re: ETMX free swinging data
|
Tue Aug 9 03:05:05 2011, kiwamu, Summary, General, weekly report
|
Tue Aug 9 02:34:26 2011, Jenny, Update, PSL, PZT transfer function measurement
|
Tue Aug 9 02:03:16 2011, kiwamu, Summary, SUS, summary of today's work on ETMY
|
Mon Aug 8 22:12:58 2011, Nicole, Summary, SUS, Daily Summary 
|
Thu Aug 4 00:04:52 2011, Jenny, Update, PSL, Network analyzer and PD set up to measure amplitude response of PZT
|
Fri Aug 5 18:29:35 2011, Jenny, Update, PSL, Network analyzer and PD set up to measure amplitude response of PZT
|
Mon Aug 8 20:23:14 2011, Jenny, Update, PSL, Network analyzer and PD set up to measure amplitude response of PZT
|
Mon Aug 8 15:52:39 2011, steve, Update, VAC, back ground rga scan 
|
Mon Aug 8 15:20:49 2011, kiwamu, Update, SUS, inspection on ETMY (round 1)
|
Sun Aug 7 14:11:53 2011, Jenne, Update, PEM, Particle counts through the roof
|
Mon Aug 8 14:21:03 2011, steve, Update, PEM, Particle counts controlled 
|
Fri Aug 5 20:44:26 2011, jamie, Metaphysics, Treasure, Film crew here Monday morning
|
Fri Aug 5 22:54:29 2011, kiwamu, Metaphysics, Treasure, Crane crew here Monday morning
|
Mon Aug 8 13:24:00 2011, steve, Metaphysics, Treasure, Monday morning
|
Thu Aug 4 08:25:51 2011, steve, Update, SUS, sus at atm 
|
Thu Aug 4 11:18:12 2011, rana, Update, SUS, sus at atm
|
Mon Aug 8 12:08:05 2011, rana, Update, SUS, sus at atm
|
Fri Aug 5 20:37:34 2011, jamie, Summary, General, Summary of today's in-vacuum work
|
Sat Aug 6 03:10:05 2011, Suresh, Summary, General, Summary of today's in-vacuum work  
|
Sat Aug 6 13:38:02 2011, rana, Summary, General, Summary of today's in-vacuum work
|
Sun Aug 7 11:10:54 2011, Suresh, Summary, General, OSEM positioning
|
Sun Aug 7 14:01:58 2011, kiwamu, Update, Green Locking, X green beam re-aligned
|
Sun Aug 7 18:41:12 2011, Jenne, Update, Green Locking, X green beam re-aligned
|
Fri Aug 5 13:51:51 2011, steve, Update, SUS, cross coupling
|
Fri Aug 5 15:11:24 2011, kiwamu, Update, SUS, Re: cross coupling
|
Fri Aug 5 08:08:42 2011, kiwamu, Summary, General, plan today
|
Mon Aug 1 23:26:32 2011, Koji, Update, LSC, REFL33 PD 
|
Wed Aug 3 02:20:33 2011, Koji, Update, LSC, REFL165 PD  
|
Wed Aug 3 22:22:47 2011, Koji, Update, LSC, REFL165 PD
|
Fri Aug 5 04:03:16 2011, Koji, Update, LSC, REFL165 PD  
|
Wed Aug 3 22:31:38 2011, Koji, Update, LSC, REFL33 PD
|
Fri Aug 5 02:00:09 2011, kiwamu, Summary, General, summary of today's invac work
|
Thu Aug 4 20:05:23 2011, Nicole, Update, SUS, New Horizontal Sliding Base Mount for TT suspension testing  
|
Thu Aug 4 09:42:19 2011, Koji, Update, ABSL, ABSL Laser shutter closed
|
Thu Aug 4 01:49:08 2011, Suresh, Update, IOO, MC is locked
|
Wed Aug 3 16:18:30 2011, steve, Update, VAC, vent is almost finished
|
Wed Aug 3 14:40:32 2011, kiwamu, Summary, General, minutes of 40m meeting : plan tomorrow
|
Wed Aug 3 14:20:49 2011, steve, Update, SUS, ITMX and PRM damping restored
|
Wed Aug 3 12:27:01 2011, Nicole, Summary, SUS, Weekly Summary   
|
Wed Aug 3 12:37:57 2011, Koji, Summary, SUS, Weekly Summary
|
Wed Aug 3 12:24:08 2011, Manuel, Ishwita, Update, WienerFiltering, Weekly summary
|
Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent
|
Wed Aug 3 11:34:59 2011, kiwamu, Update, VAC, Re: vent
|
Tue Aug 2 19:05:13 2011, kiwamu, Update, IOO, peparation for low power MC : HWP+PBS installed
|
Wed Aug 3 04:29:48 2011, kiwamu, Update, IOO, peparation for low power MC : HWP+PBS installed
|
Wed Aug 3 02:28:08 2011, Manuel, Ishwita, Update, WienerFiltering, Wiener Filtering in X-arm    
|
|