40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 97 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  16650   Mon Feb 7 16:14:37 2022 TegaUpdateComputersrealtime system reboot problemI was looking into plotting temperature
sensor data trend and why we currently do
not have frame data written to file (on /frames)
  
  16656   Thu Feb 10 14:39:31 2022 KojiSummaryComputersNetwork security issue resolved[Mike P / Koji / Tega / Anchal]

IMSS/LIGO IT notified us that "ILOM
ports" of one of our hosts on the "114"
 PXL_20220210_220816955.jpgPXL_20220210_220827167.jpg 
  16836   Mon May 9 15:32:14 2022 Ian MacMillanSummaryComputersQuantization Noise Calculation SummaryI made the first pass at a tool to measure
the quantization noise of specific filters
in the 40m system. The code for which can
 SUS-ETMX_SUSYAW3_0.0.pdfLowNoiseBiquad2.pdfquant_noise_floor.pdf 
  16881   Fri May 27 17:46:48 2022 PacoSummaryComputersCDS upgrade visit, downfall and rise of c1lsc models[Paco, Anchal-remote, Yuta, JC]

Sometime around noon today, right
after cds upgrade planning tour, c1lsc FE
  
  16991   Tue Jul 12 13:59:12 2022 ranaSummaryComputersprocess monitoring: MonitI've installed Monit
on megatron and nodus just now, and will
set it up to monitor some of our common processes.
  
  17058   Thu Aug 4 19:01:59 2022 TegaUpdateComputersFront-end machine in supermicro boxesKoji and JC looked around the lab today
and found some supermicro boxes which I was
told to look into to see if they have any
 IMG_20220804_184444473.jpgIMG_20220804_191658206.jpgIMG_20220804_185336240.jpgIMG_20220804_185023002.jpg 
  17066   Mon Aug 8 17:16:51 2022 TegaUpdateComputersFront-end machine setupAdded 3 FE machines - c1ioo, c1lsc, c1sus
-  to the teststand following the instructions
in elog15947.
 IMG_20220808_170349717.jpg 
  17074   Wed Aug 10 20:51:14 2022 TegaUpdateComputersCDS upgrade Front-end machine setupHere is a summary of what needs doing following
the chat with Jamie today.

 
 IMG_20220810_171002928.jpgIMG_20220810_171019633.jpg 
  17083   Tue Aug 16 18:22:59 2022 TegaUpdateComputersc1teststand rack mounting for CDS upgrade[Tega, Yuta]

I keep getting confused about the
purpose of the teststand. The view I am adopting
 IMG_20220816_180157132.jpgIMG_20220816_175125874.jpg 
  17088   Wed Aug 17 11:10:51 2022 ranaUpdateComputersc1teststand rack mounting for CDS upgradewe want to be able to run SimPlant on the
teststand, test our new controls algorithms,
test watchdogs, and any other software upgrades.
  
  17098   Mon Aug 22 19:02:15 2022 TegaUpdateComputersc1teststand rack mounting for CDS upgrade II[Tega, JC]

Moved the rack to the location
of the test stand just behind 1X7 and plan
 IMG_20220822_185437763.jpgIMG_20220822_131340214.jpgc1bhd.jpegc1lsc.jpeg 
  17100   Tue Aug 23 22:30:24 2022 TegaUpdateComputersc1teststand OS upgrade - I[JC, Tega, Chris]

After moving the test stand front-ends,
chiara (name server) and fb1 (boot server)
  
  17108   Fri Aug 26 14:05:09 2022 TegaUpdateComputersrack reshuffle proposal for CDS upgrade[Tega, Jamie]

Here is a proposal for what we
would like to do in terms of reshuffling
 6x 
  17109   Sun Aug 28 23:14:22 2022 JamieUpdateComputersrack reshuffle proposal for CDS upgrade@tega This looks great, thank you for putting
this together.  The rack drawing in
particular is great.  Two notes:
  
  17111   Mon Aug 29 15:15:46 2022 TegaUpdateComputers3 FEs from LLO got delivered today[JC, Tega]

We got the 3 front-ends from LLO
today. The contents of each box are:
 IMG_20220829_145533452.jpgIMG_20220829_144801365.jpg 
  17113   Tue Aug 30 15:21:27 2022 TegaUpdateComputers3 FEs from LHO got delivered today[Tega, JC]

We received the remaining 3 front-ends
from LHO today. They each have a timing card
 IMG_20220830_144925325.jpgIMG_20220830_142307495.jpgIMG_20220830_143059443.jpg 
  17127   Fri Sep 2 13:30:25 2022 Ian MacMillanSummaryComputersQuantization Noise Calculation SummaryP.
P. Vaidyanathan wrote a chapter in the
book "Handbook
 averagefiltering.pdfAveragingFilter.py.zip 
  17144   Mon Sep 19 20:21:06 2022 TegaUpdateComputers1X7 and 1X6 work[Tega, Paco, JC]


We moved the GPS network time server
 IMG_20220919_204013819.jpgIMG_20220919_203541114.jpgIMG_20220919_203458952.jpg 
  17148   Tue Sep 20 23:06:23 2022 TegaUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone[Tega, Radhika, JC]

We wired the front-ends for power,
DAQ and martian network connections. Then
 IMG_20220921_084220465.jpgdolphin_err_init_state.pngdolphin_final_state.png 
  17151   Wed Sep 21 17:16:14 2022 TegaUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone[Tega, JC]

We laid 4 out of 6 fiber cables
today. The remaining 2 cables are for the
  
  17153   Thu Sep 22 20:57:16 2022 TegaUpdateComputersbuild, install and start 40m models on teststand [Tega, Chris]

We built, installed and started
all the 40m models on the teststand today.
 dolphin_state_plus_c1shimmer.pngFE_status_overview.png 
  17158   Fri Sep 23 19:07:03 2022 TegaUpdateComputersWork to improve stability of 40m models running on teststand [Chris, Tega]

Timing glitch investigation:


Moved dolphin
 dolphin_state_all_green.pngdolphin_state_IPC_glitch.png 
  17164   Thu Sep 29 15:12:02 2022 JCUpdateComputersSetup the 6 new front-ends to boot off the FB1 clone[Jamie, Christopher, JC]

This morning we decided to label
the the fiber optic cables. While doing this,
  
  17172   Tue Oct 4 21:00:49 2022 ChrisUpdateComputersFailed takeover attempt with the new front ends[Jamie, JC, Chris]

Today we made a failed attempt
to take over the 40m hardware with the new
  
  17173   Thu Oct 6 07:29:30 2022 ChrisUpdateComputersSuccessful takeover attempt with the new front ends[JC, Chris]

Last night’s CDS
upgrade attempt succeeded in taking over
  
  309   Mon Feb 11 22:44:29 2008 robConfigurationDAQChange in channel trending on C1SUS2
I removed the MC2 optical lever related channels
from trends, and the SRM POUT and YOUT (as
 srm_sync.png 
  422   Wed Apr 16 21:11:12 2008 ranaSummaryDAQAA/AI Filters for the DAQ & FE systemsI used Foton to make up some new filters which
will be used all over the project in order
to downsample/upsample.
 DAQ_filters_080416.pdf 
  691   Thu Jul 17 16:39:58 2008 Max JonesUpdateDAQMagnetometer InstalledToday I installed the magnetometer near the
beam splitter chamber. It is located on the
BSC chamber at head height on the inner part
  
  857   Tue Aug 19 19:14:17 2008 YoichiConfigurationDAQFixed C1:IOO-MC_RFAMPDDCYoichi, Rob

C1:IOO-MC_RFAMPDDC, which is a PD at the
  
  1184   Sun Dec 7 16:12:53 2008 ranaUpdateDAQbooted awg[SIZE=3]because it was [COLOR=red]red[/COLOR][/SIZE]   
  1292   Wed Feb 11 10:52:22 2009 YoichiConfigurationDAQC1:PEM-OSA_APTEMP and C1:PEM-OSA_SPTEMP disconnectedDuring the cleanup of the lab. Steve found
a box with two BNCs going to the ICS DAQ
interface and an unconnected D-SUB on the
  
  1769   Tue Jul 21 17:01:18 2009 peteDAQDAQtemp channel PEM-PETER_FEI added a temporary channel, to input 9
on the PEM ADCU.    Beware
the 30, 31, and 32 inputs.  I tried
  
  1973   Tue Sep 8 15:14:26 2009 rana, alexConfigurationDAQRAID update to Framebuilder: directories added + lookback increased Alex
logged in around 10:30 this morning and,
  
  2073   Fri Oct 9 01:31:56 2009 ranaConfigurationDAQtpchn mysteryDoes anyone know if this master
file is the real thing that's in use now?
  
  2075   Fri Oct 9 14:23:53 2009 Alex IvanovConfigurationDAQtpchn mystery"Yes. This master file is used."

  
  3216   Wed Jul 14 11:54:33 2010 josephbUpdateDAQDebugging Guralp and rebootsThis is regards to zero signal being reported
by the channels C1:PEM-SEIS_GUR1_X, C1:PEM-SEIS_GUR1_Y,
and C1:PEM-SEIS_GUR1_Z.
  
  3220   Wed Jul 14 16:39:06 2010 JenneUpdateDAQDebugging Guralp and reboots[Joe, Jenne]
Joe got on the phone with Alex, and
Alex's magic Alex intuition told him to ask
  
  3247   Mon Jul 19 21:47:36 2010 ranaSummaryDAQDAQ timing testSince we now have a good measurement of
the phase noise of the Rb clock
Marconi locked to the Rb clock, I wanted
  
  3299   Tue Jul 27 16:03:36 2010 ranaSummaryDAQDAQ timing test

    
        
 Untitled.png 
  3657   Wed Oct 6 00:32:01 2010 ranaSummaryDAQNDS2This is the link to the NDS2 webpage:
https://www.lsc-group.phys.uwm.edu/daswg/wiki/NetworkDataServer2
We should install this so that we
  
  3702   Tue Oct 12 23:45:55 2010 ranaConfigurationDAQNDS2I installed the NDS2 Client onto the workstations
today using the instructions that Zach put
onto the Wiki with a couple of modifications.
 cerberus.jpg 
  3939   Wed Nov 17 15:49:53 2010 ranaUpdateDAQOle Channel NamesThe following channels should be named
as below to keep in line with their names
pre-upgrade rather than use _DAQ in the name.
  
  4109   Wed Jan 5 00:23:30 2011 ranaSummaryDAQFrameBuilder fails in a new waySince Leo was trying to demo his LIGO Data
Listener code, he noticed that there was
and NDS2 issue. The NDS2 guy (JZ) noticed
  
  4112   Wed Jan 5 16:00:11 2011 rana, alexSummaryDAQFrameBuilder fails in a new wayEmail from Alex:
  
  4115   Wed Jan 5 22:14:41 2011 ranaSummaryDAQFrameBuilder fails in a new wayJust a proof that the DAQ is working -
ran DTT on nodus from 3 hours ago.
 Screen_shot_2011-01-05_at_10.13.21_PM.png 
  4185   Fri Jan 21 23:17:54 2011 ranaHowToDAQDAQ Wiki FailureThe DAQ Wiki pages say to use port 8088
for restarting the Frame Builder. I tried
this to no avail.
  
  4194   Mon Jan 24 10:39:16 2011 josephbHowToDAQDAQ Wiki FailureActually
both port 8087 and 8088 work to talk to the
frame builder.  Don't let the lack of
  
  4319   Thu Feb 17 23:41:46 2011 ranaFrogsDAQFrames Directory got the wrong name: Data unreachableDTT stopped working for recent data. An
'ls' in the frames/full/ directory reveals:
drwxr-xr-x 2 controls controls
  
  4407   Sun Mar 13 00:00:58 2011 jzweizig, ranaConfigurationDAQNDS2 code change and restart John has changed the NDS2 code and
restarted it on Mafalda. The issue is that
it goes off the rails everytime the DAQD
  
  4705   Thu May 12 22:54:20 2011 ranaUpdateDAQInput Beam Naming change (no more IP) We decided to rename the Input Beam
channels (while keeping temporary backwards
compatible aliases) as:
  
ELOG V3.1.3-