  2899   Sat May 8 02:38:08 2010 KojiSummaryIOOMC incident powerAs per Steve's request I checked the
MC incident power as a function of time.
The output is negative: the lower
 MC_input.png 
  2900   Sat May 8 03:09:15 2010 KojiUpdateIOOSteering around MCAfter the MZ-removal work:
- I found that the input steering
(IM1) was right handed. This was different
  
  2908   Mon May 10 20:33:29 2010 KojiSummaryCDSFinishedThis IPC stuff looks really a nice improvement
of CDS.
Please just maintain the wiki updated
  
  2909   Mon May 10 22:25:03 2010 KojiUpdateGreen LockingGreen Laser Beam ProfileHey, what a quick work!
But,
wait...
  
  2916   Wed May 12 03:42:38 2010 KojiUpdateGreen LockingGreen Laser Beam ProfileStrange.
I thought the new  result became twice of
the first result. i.e. w0=32um or so. 
  
  2917   Wed May 12 03:52:54 2010 KojiUpdateGreen LockingReflection from ETM and ITM !I could not understand this operation.
Can you explain this a bit more?
It sounds different from the standard
  
  2918   Wed May 12 03:56:54 2010 KojiUpdateIOOFaraday alignedZach and Koji
The old small MMT was removed and
wrapped by Al foils.
  
  2921   Wed May 12 12:25:11 2010 KojiUpdateGreen LockingRe: Reflection from ETM and ITM !???
I still don't understand. What principle
are you rely on?
  
  2929   Fri May 14 03:30:45 2010 KojiSummaryIOOMC table leveledThanks Zach.This was a great job.
It was not mentioned but: was the
Faraday clamped down on the table?
  
  2935   Sat May 15 04:13:33 2010 KojiSummaryIOOMC table leveledFixing at the next time is absolutely OK.

  
  2937   Sun May 16 19:25:45 2010 KojiUpdateGreen Lockingreflected beam at PDDon't
make a short cut. The beam size at a single
place does not tell you anything. 
  
  2938   Mon May 17 02:10:10 2010 KojiConfigurationIOOHow to lock / align the MCLet
me remind you how to lock and align the IMC
To lock
  
  2942   Tue May 18 01:40:56 2010 KojiUpdateIOOFirst steps toward MC mode measuringOK. Don't worry. This is just an initial
confusion which we also had for the suspensions
a while ago.
  
  2949   Tue May 18 16:44:35 2010 KojiUpdateIOOFirst steps toward MC mode measuringHere is the upadted list http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09/Optics

  
  2954   Wed May 19 22:28:05 2010 KojiUpdateIOOHooray! We locked the MC! (and some other stuff)Good! What was the key?
The MC2 spot looks very high, but
don't believe the TV image. Believe the result
  
  2968   Fri May 21 16:24:11 2010 KojiUpdateLSC40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue.1. Give us the designed arm length. What
is the criteria?
2. The arm lengths got shorter as
  
  2985   Tue May 25 17:09:22 2010 KojiUpdateIOOBeam Profile After Mode CleanerVery nice as usual. Can you add the curve
to show the ideal mode of the MC on the profile
plot?
  
  2991   Wed May 26 14:28:01 2010 KojiUpdateIOOMirrors moved in prep for round 2 of MC mode measuringThat's true. But I thought that you measured
the mode after those optics and the effect
of them is already included.
  
  2992   Wed May 26 14:38:02 2010 KojiUpdateGreen LockinglockedCongratulation! Probably you are right,
but I could not get this is a real lock or
something else.
  
  3013   Fri May 28 23:21:52 2010 KojiUpdateIOOMC alignmentHm... You touched the optics between the
MC and the Faraday... This will lead us to
the painful work.
  
  3020   Mon May 31 03:38:48 2010 KojiUpdateIOOMC alignmentRemember
that you only can introduce the axis translations
from the PSL table.
 MC_spot_centering.png 
  3023   Tue Jun 1 06:30:38 2010 KojiConfiguration40m Upgradingeffect of the arm length I checked the effect of the arm length
to the reflectance of the f2(=5*f1) sidebands.
Conclusion: If we choose L_arm
 arm_cavity1.pngarm_cavity2.pngarm_cavity.nb.zip 
  3028   Tue Jun 1 20:40:03 2010 KojiUpdatePSLnew HIGH-LOW value for PMC_TRANSThe alarm had kept crying. I reduced the
LOW to be 0.90 and the LOLO
to be 0.85 both in psl.db and with ezcawrite.
  
  3031   Wed Jun 2 03:50:03 2010 KojiUpdateIOOmode measurement of new input opticsJust note that MMT1 has RoC of -5m (negative!).
This means that it is a lens with f=-2.5
m,
  
  3032   Wed Jun 2 04:27:02 2010 KojiUpdatePSL2W Beam ProfileThis is what I already told to Kevin and
Rana:
A direct output beam is
  
  3035   Wed Jun 2 11:28:31 2010 KojiUpdateMOPAlaser headtemp is upLast night we stopped the air conditioning.
It made HDTEMP increase.
Later we restored them and the temperature
  
  3063   Thu Jun 10 10:58:02 2010 KojiUpdateGeneralLaTeXlabsI could not dare to share my google doc
with this site...

  
  3066   Fri Jun 11 13:32:28 2010 KojiUpdateGreen Lockingend PDH with thermal feedbackGJ! 

  
  3085   Fri Jun 18 13:42:52 2010 KojiHowToGeneralUpdate your workAll SURFs (and all others as always) are
supposed to post the update of your status
on the elog.
  
  3086   Fri Jun 18 13:47:20 2010 KojiUpdateLSCShort Cavity Length AdjustmentsYou should have been in my lecture yesterday!
Power in the cavity is not a good
index (=error signal) to judge the optimal
  
  3091   Sun Jun 20 16:07:23 2010 KojiSummaryCOCCalibration of the metrology lab interferometerKiwamu and Koji
Summary
We have visited GariLynn's
 ring1_inner_centering.pdfring1_outer_centering.pdfSRMU01_pic.png 
  3095   Mon Jun 21 20:11:21 2010 KojiUpdatePhotosInspection of Magnets for the TTsWere these magnets chipped before the Ni
plating?
  
  3097   Tue Jun 22 13:38:13 2010 KojiUpdatePhase CameraCurrent phase camera setup. Seeing Acoustic beat1. In terms of the AOM:

How much beam power is  incident
  
  3109   Wed Jun 23 18:05:00 2010 KojiConfigurationPSLFSS SLOWDC should be ~-4.0FSS SLOWDC slider is at around 0.

Please someone relock this at ~-4.0 to exploit
 C1PSL_FSS.png 
  3135   Tue Jun 29 14:16:35 2010 KojiConfigurationSAFETYBack in LASER HAZARD mode. The insects and the laser trouble... Strange
coincidences with LHO surprised me, but now
I have been relieved.
  
  3164   Wed Jul 7 10:42:29 2010 KojiSummaryPSLpower spectral density from RefCav transmitted beam How do you calibrate this to Hz/rtHz?

  
  3175   Wed Jul 7 23:11:08 2010 KojiUpdateIOOMC alignment values.Hmm. I expect that you will put more details
of the work tomorrow.
i.e. motivation, method, result (the
  
  3191   Mon Jul 12 02:21:01 2010 KojiConfigurationASCResurrection of MC WFSI have resurrected the MC WFS on Friday
night.
I have uncommented the WFS part of
  
  3201   Mon Jul 12 22:01:13 2010 KojiUpdateSUSOne TT suspended. Still need fine alignmentJenne and Koji
We tweaked the alignment of the TT
mirror.
 IMG_2634.jpg 
  3228   Thu Jul 15 15:57:10 2010 KojiConfigurationLSCPRC and SRC length adjustementsTell me whether it is correct or not. Otherwise
I won't be able to sleep tonight.

  
  3264   Thu Jul 22 03:08:27 2010 KojiUpdateIOOVent and MC lockSummary

- The vacuum chambers have been vented.
  
  3300   Tue Jul 27 16:33:50 2010 KojiSummaryGeneralHigh school students tourJenne made the 40m tour for the annual
visit of 30-40 students.
c.f.
 IMG_2657.jpg 
  3318   Thu Jul 29 12:31:09 2010 KojiSummaryGeneralLab ScheduleJuly 
29 Thu BS chamber work: Move cable
towers / green steering mirrors / (2 TTs
 PSL_work_schedule.pdf 
  3329   Fri Jul 30 02:54:04 2010 KojiUpdate40m UpgradingMore optics installed on the BS tableJuly 29 Thu [Steve, Alberto, Kiwamu,
Koji]
We
  
  3332   Fri Jul 30 12:46:38 2010 KojiConfiguration40m UpgradingBS chamber status   BS_layout_Jul_29_2010.png 
  3335   Fri Jul 30 17:52:12 2010 KojiConfigurationGeneralJacketJenne and I need our jackets. We removed
them from the Rb clock.
Thanks for making them warm. Probably
  
  3338   Fri Jul 30 22:07:42 2010 KojiHowToVACHow to stop and start slow pumpdownKiwamu and Koji
The rough pumping was stopped at
230mmTorr. We are going to resume the pumping
  
  3343   Sat Jul 31 22:35:01 2010 KojiUpdateVACVac-P1 still 1.2mtorrI resumed the pumping from 19:00.
Now the valve RV1 is full open. But
the pumping is really slow as we are using
  
  3344   Sun Aug 1 18:50:35 2010 KojiUpdateVACP1 = 0.48 torrI resumed the pumping today. Now the pressure
is 0.48 torr. The pump was stopped.

  
  3348   Mon Aug 2 17:12:28 2010 KojiUpdateGeneralLab schedule for the week of Aug. 2Aug
2 Mon - 5 Thu WFS work (Nancy)
 PSL_work_schedule.pdf 