  40m Log, Page 96 of 357  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  787   Mon Aug 4 00:37:58 2008 KojiUpdateGeneralAbs. Len. Meas. ~ RF PD at the Y end / Manual frequency scan[B]Work log on August 2nd[/B]

o Just remind you:
 YEND_LAYOUT.png4th_FSR1.png4th_FSR2.png 
  788   Mon Aug 4 00:56:07 2008 KojiHowToGeneralAbs. Len. Meas. ~ Auto freq scanner with GPIB[B]Work log on August 3rd  - Part1[/B]

o Yesterday I was too much tired of changing
 freq_scan.png 
  789   Mon Aug 4 05:23:57 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Measurement for Y-arm completedFinally, I have completed the abs length and
g-factor measurements for Y-arm.
[COLOR=green][B]>>>GO FOR THE VENT<<<[/B][/COLOR]
  
  793   Mon Aug 4 21:48:24 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Scan for TEM00/01/10[B]Work log on August 3rd  - Part2[/B]

o I tried to measure the frequency of the
 TEM00.pngTEM01.pngknife_edge.png 
  794   Mon Aug 4 22:31:10 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Simple Test for TEM01/10 split[B]Work log on August 3rd - Part3[/B]

[B]Question:[/B]
 TEM01_10.png 
  795   Tue Aug 5 00:05:57 2008 KojiUpdateGeneralAbs. Len. Meas. ~ IFR2023A calibration[B]Work log on August 4th[/B]

o IFR2023A (Marconi) was calibrated by the
  
  796   Tue Aug 5 02:39:55 2008 KojiConfigurationGeneralAbs. Len. Meas. ~ Optical Layout on the AP / PSL table 2008-Aug-05Here are the PDF and the PNG of the AP and
PSL table layouts.
After this photo, the squeezing setup at
 optical_layout_ap_table3.pngoptical_layout_ap_table3.pdfoptical_layout_PSL_table1.pngoptical_layout_PSL_table1.pdf 
  801   Wed Aug 6 11:10:34 2008 KojiUpdateGeneralAbs. Len. Meas. ~ analysis of the TEM00 scan[B]Analysis of the data on August 3th ~ Part
1[/B]
 TEM00fit.pngTEM00FSRfit.png 
  802   Wed Aug 6 11:43:52 2008 KojiUpdateGeneralAbs. Len. Meas. ~ analysis of the TEM01 scan[B]Analysis of the data on August 3th ~ Part
2[/B]
 TEM01fit.png 
  838   Thu Aug 14 21:52:51 2008 KojiSummaryGeneralAbs. Len. Meas. ~ summary of my SummerI have made the summary of the absolute length
measurement.
It is attached here. The file is a bit big
 mode_spacing_measurement_080816_v2.pdf 
  1026   Sat Oct 4 07:23:42 2008 KojiMetaphysicsEnvironmentThe GatekeeperHi, this is Koji from Japan.

I am afraid that this is a poisonous spider,
  
  1717   Tue Jul 7 15:08:49 2009 KojiSummaryPhotos40 high school students visited 40MAlan and Alberto conducted a tour of 40
high-school students.
It may be the same tour that Rana
 IMG_1848.jpg 
  1753   Wed Jul 15 18:22:15 2009 KojiUpdateCamerasRe: GigE Phase Camera


   
        
            
  
  1789   Sat Jul 25 13:34:58 2009 KojiUpdateGeneralWeek 5/6 Update


   
        
            
  
  1790   Sat Jul 25 13:49:28 2009 KojiUpdateGeneralMultiply Resonant EOM Update


   
        
            
  
  1792   Sat Jul 25 19:04:01 2009 KojiUpdatePSLAligning the beam to the Faraday


   
        
            
 MC2_Cam.jpg 
  1799   Mon Jul 27 19:55:19 2009 KojiHowToIOOLens selection: plano-convex? or bi-convex?Q. When should we use plano-convex lenses,
and when should we use bi-convex?
As I had the same question from Jenne
  
  1801   Tue Jul 28 18:32:21 2009 KojiUpdateCDSRCG workPeter and Koji,

We are constructing a setup for the
  
  1813   Thu Jul 30 19:55:23 2009 KojiUpdateGeneralMultiply Resonant EOM Update


   
        
            
 imepedance.pngimpedance_meas.jpg 
  1849   Thu Aug 6 20:03:10 2009 KojiUpdateGeneralWe left two carts near PSL table.Stephanie and Koji
We left two carts near the PSL table.
We are using them for characterization
  
  1902   Fri Aug 14 14:19:25 2009 KojiSummaryComputersnodus rebootednodus was rebooted by Alex at Fri Aug 14
13:53. I launched elogd.
cd /export/elog/elog-2.7.5/
  
  2003   Fri Sep 25 17:51:51 2009 KojiUpdateMOPASolved (Re: Total MOPA power is constant, but the NPRO's power has decreased after last night's activities?)Jenne, Koji
The cause of the decrease was found
and the problem was solved. We found this
  
  2008   Sun Sep 27 14:45:45 2009 KojiUpdatePSLSLOWscan resultI ran (script dir)/PSL/FSS/SLOWscan on
op440m from 11:30 to 12:30 on 27th. Although
Rana and later I myself set "timed bombs"
 SLOWscan_090927.pngPages_from_miser_126_manual.png 
  2009   Sun Sep 27 15:25:58 2009 KojiUpdatePSLSLOWscan resultOh, AMPMON dependence could be an artifact
of the ND filter???
For my case, it should be real dependence
 power_dependence.png 
  2015   Mon Sep 28 23:44:18 2009 KojiOmnistructureSAFETYCrappy power outletJenne, Koji
Tonight we found that the wireless
for Martian network was down. 
  
  2017   Tue Sep 29 10:44:29 2009 KojiUpdateMZMZ investigationRana, Jenne, Koji
Last night we checked MZ. The apparent
thing we found was the gain slider does not
  
  2018   Tue Sep 29 12:47:08 2009 KojiUpdateMZMZ unlocked12:45 I started the work on MZ. Thus the
MZ was unlocked.
Found the bad connection on the FLKM
  
  2020   Tue Sep 29 18:21:41 2009 KojiUpdateMZMZ work doneThe
MZ work completed. I replaced
the bad cross connection terminal. The gain
  
  2022   Tue Sep 29 21:51:32 2009 KojiUpdateMZMZ work done : some noise checkingThe previous "+15" was Vctrl
= 0.25 [V]. Which was +18 dB.

  
  2023   Tue Sep 29 22:51:20 2009 KojiUpdateMZPossible gain mis-calibration at other places (Re: MZ work done)Probably there is the same mistake for
the PMC gain slider. Possibly on the FSS
slider, too???
  
  2032   Thu Oct 1 09:36:09 2009 KojiUpdateMZMZ relocked (Re:suspention damping restored and MZ HV stuck)MZ stayed unlocked. Now It was relocked.

  
  2035   Thu Oct 1 13:12:41 2009 KojiUpdateMZMZ Work from 13:00-I will investigate the MZ board. I will
unlock MZ (and MC).
  
  2038   Thu Oct 1 19:04:05 2009 KojiUpdateMZMZ work done (Re: MZ Work from 13:00-)MZ work has been done. I did not change
anything on the circuit.
Recently we observed that the MZ
 MZ_PZT.pdf 
  2039   Thu Oct 1 19:18:24 2009 KojiUpdateSUSall suspensions undampedOps. I restored the damping of the suspensions
at around 16:30.

  
  2050   Mon Oct 5 10:41:31 2009 KojiUpdatePSLPSL laser accidentally turned offThe PSL output looks smaller than the incident.
Try to FSS Slow actuator adj of -5.6 (nominal),
instead of -3.5.
  
  2055   Mon Oct 5 19:39:26 2009 KojiUpdatePSLPSL laser accidentally turned offI set the FSS slow actuator adj to -5.6
at the lunch time. It gave a little help
at that time.  Now max of the MC Trans is
  
  2060   Tue Oct 6 23:39:54 2009 KojiOmnistructureEnvironmentRF area is clean!Awesome.
I propose that anyone who tries to
do this kind of thoroughgoing cleaning should
  
  2070   Thu Oct 8 20:18:56 2009 KojiSummaryGeneralArm cavity lossLast night (Oct 07), I ran armLoss script
in order to obtain the latest numbers for
the arm cavity loss.
  
  2071   Thu Oct 8 21:32:59 2009 KojiSummaryGeneralRecycling cavity lossI looked at the data of the day before
yesterday (Oct 06) to know how much is the
recycling gain.
  
  2082   Mon Oct 12 17:27:20 2009 KojiConfigurationSAFETYStray beam blockingSteve, Kiwamu, and Koji
We went through the PSL table to
make sure any strong beam did not hit the
 PSL.png 
  2085   Mon Oct 12 19:53:44 2009 KojiConfigurationSAFETYStray beam blockingI aligned the EOM and the beam to the PMC.
The beam is still hitting the bottom of the
EOM aperture, 
  
  2087   Mon Oct 12 20:01:13 2009 KojiConfigurationSAFETYStray beam blockingOK! I saw the optics are redundant and
some of the components are not in a right
place.
  
  2103   Fri Oct 16 12:40:59 2009 KojiConfigurationGeneralSome questionsSome questions came arise to me:
A. How the green injection system
should be? How the handing off between 532
  
  2104   Fri Oct 16 13:25:18 2009 KojiSummaryLSCfunny timing setup on the LSCCould be this.
http://ilog.ligo-la.caltech.edu/ilog/pub/ilog.cgi?group=detector&task=view&date_to_view=10/02/2009&anchor_to_scroll_to=2009:10:02:13:33:49-waldman

  
  2113   Sun Oct 18 23:02:03 2009 KojiUpdateLSCLSC timing issueYou yourself told me that tdsdata uses
some downconversion from 32k to 16k!
So, how does the downconversion appears
  
  2128   Wed Oct 21 13:07:54 2009 KojiUpdateWIKI-40M UpdatePSL Table Diagram wiki entryhttp://lhocds.ligo-wa.caltech.edu:8000/40m/PSL_Table_Diagram
Thanks. I love this. Could you also
put the original file that is editable for
  
  2135   Thu Oct 22 21:58:26 2009 KojiUpdateWIKI-40M UpdatePSL Table Diagram wiki entryDiagram. I don't want to say PNG is an
editable format for this purpose...
You have the PPT, PDF or any drawing
  
  2147   Mon Oct 26 23:14:08 2009 KojiUpdatePSLlaser power is down I adjusted the steerings to the PMC and
gained 7%. Now the MC_TRANS 7.0 has been
recovered.
 PSL091026.png 
  2149   Tue Oct 27 15:55:04 2009 KojiUpdateGeneralISS injection work / HEPA is onI was working on the ISS excitation to
take TFs.
I used ISS IL excitation, stealing
  
  2158   Thu Oct 29 13:48:32 2009 KojiUpdatePSLNPRO LTMP lowered 9.5deg13:00 Found MC TRANS less than 7.
13:50 Go into the PSL table.
14:20 Work done. Now I am running
 091028_PSL.png 
ELOG V3.1.3-