40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 95 of 341  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  3191   Mon Jul 12 02:21:01 2010 KojiConfigurationASCResurrection of MC WFSI have resurrected the MC WFS on Friday
night.
I have uncommented the WFS part of
  
  3201   Mon Jul 12 22:01:13 2010 KojiUpdateSUSOne TT suspended. Still need fine alignmentJenne and Koji
We tweaked the alignment of the TT
mirror.
 IMG_2634.jpg 
  3228   Thu Jul 15 15:57:10 2010 KojiConfigurationLSCPRC and SRC length adjustementsTell me whether it is correct or not. Otherwise
I won't be able to sleep tonight.

  
  3264   Thu Jul 22 03:08:27 2010 KojiUpdateIOOVent and MC lockSummary

- The vacuum chambers have been vented.
  
  3300   Tue Jul 27 16:33:50 2010 KojiSummaryGeneralHigh school students tourJenne made the 40m tour for the annual
visit of 30-40 students.
c.f.
 IMG_2657.jpg 
  3318   Thu Jul 29 12:31:09 2010 KojiSummaryGeneralLab ScheduleJuly 
29 Thu BS chamber work: Move cable
towers / green steering mirrors / (2 TTs
 PSL_work_schedule.pdf 
  3329   Fri Jul 30 02:54:04 2010 KojiUpdate40m UpgradingMore optics installed on the BS tableJuly 29 Thu [Steve, Alberto, Kiwamu,
Koji]
We
  
  3332   Fri Jul 30 12:46:38 2010 KojiConfiguration40m UpgradingBS chamber status   BS_layout_Jul_29_2010.png 
  3335   Fri Jul 30 17:52:12 2010 KojiConfigurationGeneralJacketJenne and I need our jackets. We removed
them from the Rb clock.
Thanks for making them warm. Probably
  
  3338   Fri Jul 30 22:07:42 2010 KojiHowToVACHow to stop and start slow pumpdownKiwamu and Koji
The rough pumping was stopped at
230mmTorr. We are going to resume the pumping
  
  3343   Sat Jul 31 22:35:01 2010 KojiUpdateVACVac-P1 still 1.2mtorrI resumed the pumping from 19:00.
Now the valve RV1 is full open. But
the pumping is really slow as we are using
  
  3344   Sun Aug 1 18:50:35 2010 KojiUpdateVACP1 = 0.48 torrI resumed the pumping today. Now the pressure
is 0.48 torr. The pump was stopped.

  
  3348   Mon Aug 2 17:12:28 2010 KojiUpdateGeneralLab schedule for the week of Aug. 2Aug
2 Mon - 5 Thu WFS work (Nancy)
 PSL_work_schedule.pdf 
  3350   Mon Aug 2 21:52:57 2010 KojiUpdateIOOMC is running at the full power[Nancy and Koji]
We restored the full power operation
of the MC.
  
  3355   Wed Aug 4 01:44:56 2010 KojiConfigurationPEMAccelerometer located on and below the PSL table[Jenne and Koji] 
In order to characterize the seismic vibration
 IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg 
  3364   Thu Aug 5 00:17:41 2010 KojiUpdatePSLPSL preparation workWe start the work on the cables at around
the PSL table.
  
  3367   Thu Aug 5 13:05:53 2010 KojiUpdateIOOMode Cleaner WFSUpon Nancy's request, I checked the status
of the suspensions.
I found that the power strip of the
  
  3369   Thu Aug 5 17:59:23 2010 KojiUpdatePSLCable removal from the control room[Alberto, Kiwamu, and Koji]
We removed the BNC cables from the
control room. 
 IMG_2684.jpg 
  3370   Thu Aug 5 22:36:11 2010 KojiUpdatePSLPSL preparation workPSL preparation work

  
  3374   Fri Aug 6 12:33:10 2010 KojiUpdateIOOMode Cleaner WFS


   
        
            
  
  3375   Fri Aug 6 12:44:29 2010 KojiUpdateIOOMC data taking over the weekendQuestion:
Do you like to keep the WFS turned
on? 
  
  3381   Fri Aug 6 20:00:03 2010 KojiUpdatePSLPSL preparation workPSL preparation work report
Aug 6th
10am-5pm: (Steve
 PSL_cable_map.pdf 
  3382   Sat Aug 7 10:47:38 2010 KojiSummaryelogelog restarted / source of the trouble eliminatedNancy
notified me that the elog crashed. It was
  
  3383   Sat Aug 7 11:07:44 2010 KojiConfigurationPSLMC kept locked / PMC control gain reduced to +13dBJenne asked us to keep th MC locked
and let the seismometers happy through this
weekend.
  
  3388   Mon Aug 9 15:54:43 2010 KojiUpdateIOOMode Cleaner ASCThe WFS and QPD servos were working.
That was great.
Everything was fine except for the
  
  3391   Tue Aug 10 05:56:07 2010 KojiUpdatePSLPSL Table Lifting PreparationWork
on Aug 9th
Steve, Jenne,
Koji, Alberto, Aidan, Jan, Sharmila, Katherine
From
 IMG_2686.jpgIMG_2691.jpgIMG_2692.jpgIMG_2711.jpg 
  3395   Tue Aug 10 22:40:55 2010 KojiSummaryPEMAccelerometer located on and below the PSL tableResult
of the accelerometer measurement
Introduction

We wanted to characterize
 PEM_100809.pdf 
  3403   Wed Aug 11 16:56:00 2010 KojiSummaryEnvironmentCovering of the IFOKatharine, Sharmila, Gopal, Kiwamu,
Jenne, Aidan, Steve, and Koji
A guy from the carpenter shop has
 IMG_2732.jpg 
  3412   Thu Aug 12 17:10:07 2010 KojiUpdatePhase CameraSideband power measurement (updated)This sounds very relieving although this
could be a lower bound of the number.
Why didn't you use the output on the
  
  3487   Mon Aug 30 13:57:25 2010 KojiSummaryPSLPSL table vibrational performance after the upgradeJenne and Koji
Last week Jenne has put the accelerometers
on and under the PSL table immediately after
 PEM_100830_SPE.pdfPEM_100830.pdf 
  3502   Wed Sep 1 08:28:43 2010 KojiUpdatePSLPSL upgrade update


   
        
            
  
  3503   Wed Sep 1 08:36:59 2010 KojiHowToPSL2W NPRO Mount designed with emachineshop.com software1. I can not see whether the attaching
surface is flat or not.
It should have ~1mm step to avoid
  
  3522   Fri Sep 3 13:04:30 2010 KojiFrogsElectronicsCable cutting toolsYeah, this looks nice.
And I also like to have something
I have attached. This is "HOZAN P-90",
 P90.jpg 
  3527   Mon Sep 6 20:38:58 2010 KojiUpdateCDSSusension model reviewedI have reviewed the suspension model of
C1SUS and refined it.
It is comaptible to the current one
 suspension_model.pdf 
  3575   Wed Sep 15 03:08:26 2010 KojiUpdatePSLFSS lockingBrilliant! This is the VERY way
how the things are to be conquered!

  
  3581   Fri Sep 17 03:06:06 2010 KojiUpdateSUSSOS sent for bakingTwo SOS suspensions for the ETMs were
disassembled and packed for cleaning and
baking by Bob.
 IMG_3596.jpgIMG_3597.jpg 
  3582   Fri Sep 17 03:32:11 2010 KojiUpdateSUSArrangement of the SUS towersThe day before yesterday, I was cleaning
a flow bench in the clean room.
I found that one SOS was standing
  
  3595   Wed Sep 22 22:22:12 2010 KojiConfigurationComputersNetgear Network Switch fan broken.Net switch mumbo-jumbo:
Although Rana is going to buy a replacement
for the Netgear Switch for martian, I opened
  
  3597   Thu Sep 23 02:45:30 2010 KojiSummaryComputersnodus gracefully rebootedZach> Nodus seemed to be working fine
again, and I was browsing the elog with no
  
  3599   Thu Sep 23 11:15:20 2010 KojiFrogsComputersnodus gracefully rebootedsvn is back after starting apache on nodus.
http://lhocds.ligo-wa.caltech.edu:8000/40m/ApacheOnNodus

  
  3601   Thu Sep 23 13:16:57 2010 KojiFrogsComputersnodus gracefully rebootedmafalda is up now.
I found that the cable for mafalda
(the sole red cable) had a broken latch.
  
  3608   Sat Sep 25 19:01:13 2010 KojiUpdateElectronicstesting TTFSSHow much current do you need for each voltages?
GE-82 was the only PNP transister
I could find in the lab. It's too old but
  
  3669   Thu Oct 7 15:05:46 2010 KojiUpdatePSLmeasured PMC's laser power-output relationIt was a bit difficult to comprehend the
result.
Is it good? or bad? Have you seen
  
  3671   Thu Oct 7 16:21:02 2010 KojiOmnistructureCDSBig 3Both Rolf and Alex (at least his elbow)
together visited the 40m to talk with Joe
for the CDS.
 IMG_3642.jpg 
  3683   Sun Oct 10 16:44:59 2010 KojiOmnistructurePhotosKepco Tube HV supply   IMG_3637.jpgIMG_3640.jpg 
  3684   Sun Oct 10 16:59:20 2010 KojiOmnistructureCOCPRM phase map measurement at Downs SB 014[Kiwamu, Yuta, Koji]
We went to the new metrology lab
at Downs subbasement (Rm014) in order to
 IMG_3646.jpgIMG_3647.jpg 
  3685   Sun Oct 10 18:09:02 2010 KojiSummaryCOCPhase map interferometer calibration for the data on Oct 8th, 2010 Summary:
Calibration
of the phase map interferometer was calculated
for the data on Oct 8th, 2010.
 calibration.pdf 
  3724   Thu Oct 14 22:26:38 2010 KojiUpdateComputersNew Netgear SwitchThe network cables for the Martian network were
moved to the new Netgear switch
  
  3726   Fri Oct 15 00:15:52 2010 KojiUpdateIOO2W NPRO laser output power versus temperatureFrom the plot, you observed the reduction
of the output power only by 1% between 25deg
to 45deg.
  
  3737   Mon Oct 18 18:00:36 2010 KojiUpdateSUSOld PRM, SRM stored, new PRM drag wiped- Steve is working on the storage shelf
for those optics.
- PRMU002 was chosen as it has the
  
ELOG V3.1.3-